Revision history of "Extension of railway access to the western part of Gdynia Port – reconstruction and electrification" (Q85924)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 45,646 bytes 0 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 45,646 bytes −5 Set a claim value: summary (P836): O projeto tem por objeto a eletrificação do ramal do terminal ferroviário intermodal com a sua reconstrução, a construção de uma nova via e de novos interruptores no grupo de entrada e de saída, bem como a instalação de um novo sistema de controlo do tráfego ferroviário (SRK).

22 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

24 October 2022

26 July 2022

  • curprev 04:1804:18, 26 July 2022DG Regio talk contribs 41,784 bytes +23,674 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 12,943 bytes +1,154 Created claim: summary (P836): L’objet du projet est l’électrification de la voie d’évitement du terminal ferroviaire intermodal ainsi que sa reconstruction, la construction d’une nouvelle voie et de nouveaux aiguillages sur le groupe d’arrivée et de départ, ainsi que l’installation d’un nouveau système de contrôle du trafic ferroviaire (SRK)., translated_summary
  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 11,789 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5414:54, 14 October 2020DG Regio talk contribs 12,058 bytes +161 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5414:54, 14 October 2020DG Regio talk contribs 11,897 bytes −167 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5414:54, 14 October 2020DG Regio talk contribs 12,064 bytes +1,086 Created claim: summary (P836): The subject of the project is electrification of the intermodal railway terminal siding with its reconstruction, construction of a new track and new switches on the incoming and departure group, as well as the installation of a new rail traffic control system (SRK)., translated_summary
  • curprev 14:5414:54, 14 October 2020DG Regio talk contribs 10,978 bytes −624 Removed claim: summary (P836): The project consists of the electrification of the Intermodal Rail Terminal siding with its conversion, construction of a new track and new switches to the incoming and outgoing groups, as well as the installation of a new traffic control system (SRK)., remove_old_english_translation

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 9,882 bytes +624 Created claim: summary (P836): The project consists of the electrification of the Intermodal Rail Terminal siding with its conversion, construction of a new track and new switches to the incoming and outgoing groups, as well as the installation of a new traffic control system (SRK)., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020