Revision history of "Modernisation of the water level Rędzin on the Oder in km 260.7 – adaptation to the third class of the waterway" (Q85887)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0222:02, 12 October 2024DG Regio talk contribs 46,155 bytes +3 Changed label, description and/or aliases in pt
  • curprev 22:0222:02, 12 October 2024DG Regio talk contribs 46,152 bytes +22 Set a claim value: summary (P836): O projeto inclui a modernização do nível da água de Rędzin, incluindo a renovação e reparação das eclusas existentes e dos engarrafamentos segmentados, das suas unidades e componentes gerais de construção, juntamente com a infraestrutura; renovação e modernização de instalações elétricas, bem como reparação e reparação de seguros de declives em terra e de limites máximos de distribuição.

22 March 2024

15 January 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3222:32, 2 March 2023DG Regio talk contribs 44,877 bytes −327 Changed label, description and/or aliases in da, it, lv, sk, sl, pt, fi, et, sv, hu, de, fr, bg, ro, nl, lt, mt, hr, cs, el, es, ga, and other parts

22 October 2022

26 July 2022

  • curprev 04:1704:17, 26 July 2022DG Regio talk contribs 44,387 bytes +25,611 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1121:11, 30 November 2021DG Regio talk contribs 13,249 bytes +1,256 Created claim: summary (P836): Le projet comprend la modernisation de l’étape d’eau de Rędzin, y compris la réparation et la réparation des portes existantes et des fermetures de déversoirs segmentés, leurs entraînements et les éléments de construction généraux ainsi que les infrastructures; révision et modernisation du système électrique, ainsi que réparation et réparation de l’assurance des pentes côtières et des embouts de distribution., translated_summary
  • curprev 21:1121:11, 30 November 2021DG Regio talk contribs 11,993 bytes +182 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,251 bytes +174 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,077 bytes −150 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,227 bytes +1,173 Created claim: summary (P836): The project includes the modernisation of the water level of Rędzin, including the renovation and repair of existing locks and segmented jams, their drives and general building elements together with the infrastructure; renovation and modernisation of electrical installations as well as repair and repair of shore slope insurance and distribution cap., translated_summary
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 11,054 bytes −793 Removed claim: summary (P836): The project consists of a modernisation of the water grade by hand, including the repair and repair of existing gate and segment closures of the weir, their propulsion and the construction of components and structures along with the infrastructure;renovation and modernisation of electrical installations as well as the renovation and repair of the insurance of the Crown of the Crown and of the distribution of sections., remove_old_english_trans...

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0010:00, 4 March 2020DG Regio talk contribs 10,127 bytes +793 Created claim: summary (P836): The project consists of a modernisation of the water grade by hand, including the repair and repair of existing gate and segment closures of the weir, their propulsion and the construction of components and structures along with the infrastructure;renovation and modernisation of electrical installations as well as the renovation and repair of the insurance of the Crown of the Crown and of the distribution of sections., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020