Revision history of "Modernisation of the Świnoujście water track – Szczecin to a depth of 12.5 m" (Q85886)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 21:3121:31, 2 March 2023DG Regio talk contribs 88,519 bytes +217 Changed label, description and/or aliases in sk, it, da, el, sv, ro, hu, fi, lv, fr, cs, ga, et, pt, lt, mt, es, nl, hr, de, sl, bg, and other parts

22 October 2022

26 July 2022

  • curprev 04:1704:17, 26 July 2022DG Regio talk contribs 87,500 bytes +55,842 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1121:11, 30 November 2021DG Regio talk contribs 19,212 bytes +3,093 Created claim: summary (P836): Le projet comprend l’exécution de travaux dans le domaine de: a) l’approfondissement de la voie jusqu’à 12,5 m avec expansion simultanée (y compris les passages) sur les sections droites et les extensions appropriées sur les courbes et sur les sections de transition en bas avec les ajustements nécessaires à la géométrie de la voie navigable (env. 62 km); la reconstruction (rajustement) des pentes de rivage sans renforts; C) nivellement du fond d...
  • curprev 21:1121:11, 30 November 2021DG Regio talk contribs 16,119 bytes +149 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 16,410 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 16,271 bytes −127 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 16,398 bytes +2,939 Created claim: summary (P836): The project covers the execution of works on: a) deepening the track to 12,5 m with the simultaneous extension of the track (including passing passings) on straight sections and with appropriate extensions on curves and on transition sections in the bottom, together with necessary adjustments to the geometry of the water track (approx. 62 km; reconstruction (regulation) of shore scarves without fortifications; C) levelling of the bottom in the z...
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 13,459 bytes −2,451 Removed claim: summary (P836): The project shall include the execution of works on:(a) an increase of the track to 12.5 m combined with a widening of the track (including the execution of mitans) in straight lines and adequate extension on the curves and on the transitional sections in the bottom with the necessary adjustments for the water track geometry (ca.62 km);restructuring (regulation) of Crown turbot without citations;the closure of the bottom in the area of Świnouj...

15 July 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0010:00, 4 March 2020DG Regio talk contribs 13,357 bytes +2,451 Created claim: summary (P836): The project shall include the execution of works on:(a) an increase of the track to 12.5 m combined with a widening of the track (including the execution of mitans) in straight lines and adequate extension on the curves and on the transitional sections in the bottom with the necessary adjustments for the water track geometry (ca.62 km);restructuring (regulation) of Crown turbot without citations;the closure of the bottom in the area of Świnoujśc...

18 February 2020

8 February 2020

31 January 2020

14 January 2020