Revision history of "Replacement of the floating maritime office in Gdynia" (Q85876)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0222:02, 12 October 2024DG Regio talk contribs 48,639 bytes +2 Changed label, description and/or aliases in pt
  • curprev 22:0222:02, 12 October 2024DG Regio talk contribs 48,637 bytes 0 Set a claim value: summary (P836): O âmbito do projeto previsto inclui a modernização do Gabinete Marítimo flutuante do material circulante em Gdynia. O âmbito da modernização abrange a aquisição dos seguintes navios de material circulante: uma unidade hidrográfica especializada com equipamento sob a forma de um novo sistema de recolha e tratamento de dados hidrográficos; unidade para a operação da Capitania do Porto de Gdynia; Uma unidade de marcação de navegação nas águas da Lagoa...

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 47,382 bytes +96 Changed label, description and/or aliases in da, it, sk, pt, hr, ga, et, es, fi, fr, lv, lt, ro, sv, hu, mt, sl, el, bg, cs, de, nl, and other parts

22 October 2022

26 July 2022

  • curprev 04:1704:17, 26 July 2022DG Regio talk contribs 46,494 bytes +26,931 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0621:06, 30 November 2021DG Regio talk contribs 13,553 bytes +1,424 Created claim: summary (P836): La portée du projet prévu comprend la modernisation de la flotte flottante du bureau maritime de Gdynia. Le champ d’application de la modernisation comprend l’achat des navires suivants: une unité hydrographique spécialisée dotée d’équipements sous la forme d’un nouveau système de collecte et de traitement des données hydrographiques; B) une unité chargée de l’exploitation du capitaine du port de Gdynia; une unité chargée d’utiliser des marques...
  • curprev 21:0621:06, 30 November 2021DG Regio talk contribs 12,129 bytes +123 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,446 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,334 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,459 bytes +1,327 Created claim: summary (P836): The scope of the planned project includes the modernisation of the rolling stock floating Maritime Office in Gdynia. The scope of modernisation shall cover purchases of the following vessels of rolling stock: a specialised hydrographic unit with equipment in the form of a new system for the collection and processing of hydrographic data; unit for the operation of the Gdynia Port Captainate; a navigational marking unit in the waters of the Vistul...
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 11,132 bytes −859 Removed claim: summary (P836): The scope of the planned operation includes modernisation of the rolling stock of the Maritime Office in Gdynia.The scope of the upgrade covers the purchases of the following vessels of floating rolling stock:a) specialised hydrographic unit with equipment in the form of a new storage and processing system;an entity for the operation of the port captain of Gdynia;(c) the service operator for the navigation marking in waters of the Vistula Lago...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 10,276 bytes +859 Created claim: summary (P836): The scope of the planned operation includes modernisation of the rolling stock of the Maritime Office in Gdynia.The scope of the upgrade covers the purchases of the following vessels of floating rolling stock:a) specialised hydrographic unit with equipment in the form of a new storage and processing system;an entity for the operation of the port captain of Gdynia;(c) the service operator for the navigation marking in waters of the Vistula Lagoon...

18 February 2020

8 February 2020

31 January 2020

14 January 2020