Revision history of "Construction of the S61 expressway. Ostrów Mazowiecka – Szczuczyn" (Q85873)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0222:02, 12 October 2024DG Regio talk contribs 56,421 bytes 0 Changed label, description and/or aliases in pt
  • curprev 22:0222:02, 12 October 2024DG Regio talk contribs 56,421 bytes +12 Set a claim value: summary (P836): O projeto tem como objetivo construir a via expressa S61. Ostrów Mazowiecka-Szczuczyn o dł. São 91 milhas. O investimento está localizado na parte nordeste da Polónia e atravessa as voivodias de Mazowieckie e Podlaskie. A estrada projetada funciona, em parte, numa nova área de apoio, principalmente no lado ocidental da atual Dk n.o 63 e, em parte, na atual secção 61. Durante todo o investimento, é disponibilizada uma secção transversal bidirecional...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 52,268 bytes −225 Changed label, description and/or aliases in lv, da, it, bg, sk, fi, pt, hr, de, el, lt, hu, fr, ro, cs, sv, et, mt, nl, sl, es, ga, and other parts

22 October 2022

26 July 2022

  • curprev 04:1704:17, 26 July 2022DG Regio talk contribs 50,966 bytes +27,653 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:0621:06, 30 November 2021DG Regio talk contribs 18,119 bytes +1,385 Created claim: summary (P836): Le projet vise à construire l’autoroute S61 odc. Ostrów Mazowiecka-Szczuczyn depuis longtemps. 91 km. L’investissement est situé dans la partie nord-est de la Pologne et traverse les voïvodies Mazowieckie et Podlaskie. La route prévue suit en partie une nouvelle empreinte, principalement du côté ouest de la dk 63 existante et en partie à l’intérieur de la section existante dk 61. Pour l’ensemble du tronçon de l’investissement, un tronçon à deux...
  • curprev 21:0621:06, 30 November 2021DG Regio talk contribs 16,734 bytes +130 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 17,044 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 16,917 bytes −129 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 17,046 bytes +1,322 Created claim: summary (P836): The project aims to build the S61 expressway. Ostrów Mazowiecka-Szczuczyn o dł. It’s 91 miles. The investment is located in the north-eastern part of Poland and runs through the Mazowieckie and Podlaskie voivodeships. The projected road runs partly on a new footprint mainly on the western side of existing Dk No 63 and partly within the existing section 61. A two-way cross-section with two lanes and an emergency lane, adapted to the forecast traf...
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 15,724 bytes −936 Removed claim: summary (P836): The project aims at the construction of the S61 express road.Ostrów Mazowiecka-Szczuczyn with a length of inactivity91 km.The investment is located in the north-eastern part of Poland and passes through the area of the Mazowieckie and Podlaskie provinces.The proposed road follows partly on the new incident mainly on the western side of the existing dk No 63 and partly within the existing segment dk No 61.The entire length of the investment in...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 12,882 bytes +936 Created claim: summary (P836): The project aims at the construction of the S61 express road.Ostrów Mazowiecka-Szczuczyn with a length of inactivity91 km.The investment is located in the north-eastern part of Poland and passes through the area of the Mazowieckie and Podlaskie provinces.The proposed road follows partly on the new incident mainly on the western side of the existing dk No 63 and partly within the existing segment dk No 61.The entire length of the investment in qu...

18 February 2020

8 February 2020

31 January 2020

14 January 2020