Revision history of "Construction of the S7 expressway. Warsaw – Grójec" (Q85866)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

23 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:3222:32, 2 March 2023DG Regio talk contribs 45,110 bytes −30 Changed label, description and/or aliases in da, it, sk, pt, fi, hr, fr, lv, et, ga, sv, ro, lt, mt, es, hu, sl, el, bg, de, cs, nl, and other parts

22 October 2022

26 July 2022

  • curprev 04:1704:17, 26 July 2022DG Regio talk contribs 43,252 bytes +21,882 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

29 October 2020

14 October 2020

23 September 2020

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 12,194 bytes +620 Created claim: summary (P836): The main part of the project is the construction of the S7 expressway, along the section beginning in the vicinity of the “Lotnisko” interchange to the Grójec bypass, located on the comprehensive TEN-T network with a total length of 29.16 km., Adding English summary

18 February 2020

8 February 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)