Revision history of "Construction of the S17 expressway Warsaw – Garwolin, St. W. Turn – w. Lubelska" (Q85859)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 73,965 bytes −8 Changed label, description and/or aliases in pt
  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 73,973 bytes +38 Set a claim value: summary (P836): O projeto visa a construção da via rápida S17 Varsóvia – Garwolin, odc. w. Zakręt – w. Lubelska, com uma extensão de 4,466 km, localizada na rede principal da RTE-T. O projeto é complementado pela construção de um troço da estrada S2 com um comprimento de 1,538 km no cruzamento «Lubelska», que também está localizado na rede principal da RTE-T. O projeto é composto pelas seguintes secções, executadas sob a forma de contratos de obras distintos: — Nó...

22 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 70,040 bytes −2,404 Changed label, description and/or aliases in da, it, sk, lv, fi, de, bg, ga, hu, pt, sv, et, ro, mt, sl, hr, cs, lt, es, el, fr, nl, and other parts

22 October 2022

26 July 2022

  • curprev 04:1704:17, 26 July 2022DG Regio talk contribs 71,277 bytes +43,948 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:0521:05, 30 November 2021DG Regio talk contribs 18,124 bytes +2,332 Created claim: summary (P836): Le projet vise à construire l’autoroute S17 Varsovie — Garwolin, à partir de Zakręt — Lubelska, d’une longueur de 4,466 km, située sur le réseau central du RTE-T. Le projet est complété par la construction d’un tronçon de la route S2 d’une longueur de 1,538 km à l’intérieur du carrefour «Lubelska», qui est également situé sur le réseau central du RTE-T. Le projet comprend les tronçons suivants, mis en œuvre sous la forme de contrats de travaux d...
  • curprev 21:0521:05, 30 November 2021DG Regio talk contribs 15,792 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 16,090 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 15,948 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 16,062 bytes +2,220 Created claim: summary (P836): The project aims at the construction of the S17 expressway Warsaw – Garwolin, odc. w. Zakręt – w. Lubelska, with a length of 4.466 km, located in the TEN-T core network. The project is complemented by the construction of a section of the S2 road with a length of 1.538 km within the “Lubelska” junction, which is also located in the TEN-T core network. The project consists of the following sections, carried out as separate works contracts: — “Key”...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,842 bytes −1,830 Removed claim: summary (P836): The project aims to build an expressway S17 Warszawa — Garwlin. a 4,466-km mark is located on the core TEN-T core network. the addition of investment is the construction of a 1.538 km stretch of the S2 road within the ‘Lubelska’ interchange, which is also located in the core TEN-T network. the project in question consists of the following sections, which are carried out as separate contracts for construction work:The ‘Zakarm’ — ‘Lubelska inter...

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 12,726 bytes +1,830 Created claim: summary (P836): The project aims to build an expressway S17 Warszawa — Garwlin. a 4,466-km mark is located on the core TEN-T core network. the addition of investment is the construction of a 1.538 km stretch of the S2 road within the ‘Lubelska’ interchange, which is also located in the core TEN-T network. the project in question consists of the following sections, which are carried out as separate contracts for construction work:The ‘Zakarm’ — ‘Lubelska interch...

18 February 2020

8 February 2020

31 January 2020

14 January 2020