Revision history of "Construction of the S6 expressway Szczecin – Koszalin, pc. Kielpino – post. Bypass Koszalin and Sianowa" (Q85853)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 72,581 bytes −12 Changed label, description and/or aliases in pt
  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 72,593 bytes +59 Set a claim value: summary (P836): O projeto consiste na construção da via rápida S6 no troço Kiełpino – início das estradas circulares de Koszalin e Sianów, com um comprimento total de 62,84 km, localizadas na rede RTE-T. O projeto é composto por três secções (contratos): • Episódio 4: Conceção e construção da estrada S-6 no troço do nó Kiełpino/nó/- Kołobrzeg Oeste/com nó/ do km 84 + 000,00 ao km 108 + 024,69, • Episódio 5: Conceção e construção da estrada S-6 no troço do nó de Koł...

23 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 69,056 bytes −735 Changed label, description and/or aliases in da, lv, it, sk, ga, fi, es, hr, et, sl, ro, de, el, cs, sv, fr, lt, bg, nl, pt, hu, mt, and other parts

26 January 2023

25 January 2023

22 October 2022

26 July 2022

  • curprev 04:1604:16, 26 July 2022DG Regio talk contribs 68,258 bytes +40,538 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 18,514 bytes +2,164 Created claim: summary (P836): Le projet consiste en la construction de l’autoroute S6 sur le tronçon Kiełpino — le début du périphérique Koszalin et Sienov d’une longueur totale de 62,84 km située dans le réseau RTE-T. Le projet se compose de trois tronçons (contrats): • Épisode 4: Conception et construction de la route S-6 sur le tronçon du nœud Kiełpino/sans jonction/- échangeur Kołobrzeg Zachod/avec nœud/; du km 84+ 00 au km 108 + 024,69, • Section 5: Conception et constr...
  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 16,350 bytes +175 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 16,615 bytes +167 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 16,448 bytes −154 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 16,602 bytes +2,077 Created claim: summary (P836): The project consists of the construction of the S6 expressway on the Kiełpino section – the beginning of the Koszalin and Sianów ring roads with a total length of 62.84 km located in the TEN-T network. The project consists of three sections (contracts): • Episode 4: Design and construction of the S-6 road at the section of Kiełpino node/node/- Kołobrzeg West/with node/ from km 84 + 000.00 to km 108 + 024.69, • Episode 5: Design and construction...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 14,525 bytes −1,659 Removed claim: summary (P836): The project consists of the construction of the S6 expressway on the section Kiełpino — start of the Koszalin and Sanov bypass of a total length of 62.84 km located on the TEN-T network. the project consists of three sections (contracts):• Section 4:Design and construction of the S-6 road on the section Kiełpino/nokły/— Kołobrzeg Khamzag node/with nowm/;from km 84 + 000,00 to km 108 + 024,69,• Section 5:The project and the construction of the...

23 September 2020

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 12,816 bytes +1,659 Created claim: summary (P836): The project consists of the construction of the S6 expressway on the section Kiełpino — start of the Koszalin and Sanov bypass of a total length of 62.84 km located on the TEN-T network. the project consists of three sections (contracts):• Section 4:Design and construction of the S-6 road on the section Kiełpino/nokły/— Kołobrzeg Khamzag node/with nowm/;from km 84 + 000,00 to km 108 + 024,69,• Section 5:The project and the construction of the S-...

18 February 2020

8 February 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)