Revision history of "Construction of the S7 expressway. Lubień – Rabka" (Q85852)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 91,011 bytes −13 Changed label, description and/or aliases in pt
  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 91,024 bytes −89 Set a claim value: summary (P836): A parte principal do projeto é a construção da via rápida S7 no troço Lubień – Rabka, localizado na rede global da RTE-T, com um comprimento total de 15 830 km. É complementado pela construção de um novo troço da estrada nacional n.o 47 da classe GP no troço Rabka Zdrój – Chabówka com um comprimento de 0,877 km, que liga a via rápida S7 à atual estrada nacional n.o 47. O início do investimento (km 713+ 580) começa nos arredores de Lubień, no distrit...

7 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 89,080 bytes +1,650 Changed label, description and/or aliases in lv, it, da, sk, et, fi, ro, cs, de, pt, sv, hr, el, fr, lt, bg, hu, es, mt, sl, nl, ga, and other parts

22 October 2022

26 July 2022

  • curprev 04:1604:16, 26 July 2022DG Regio talk contribs 86,616 bytes +54,996 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 18,448 bytes +3,121 Created claim: summary (P836): La partie principale du projet est la construction de la voie express S7 sur le tronçon Lubień — Rabka, située dans le réseau global RTE-T d’une longueur totale de 15,830 km. À cela s’ajoute la construction d’un nouveau tronçon de la route nationale no 47 de la classe PG sur le tronçon Rabka Zdrój — Chabówka d’une longueur de 0,877 km, qui est la liaison entre l’autoroute S7 et l’actuelle route nationale no 47. Le début de l’investissement (km 7...
  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 15,327 bytes +113 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 15,654 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 15,543 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 15,659 bytes +2,918 Created claim: summary (P836): The main part of the project is the construction of the S7 expressway on the Lubień – Rabka section, located in the TEN-T comprehensive network with a total length of 15.830 km. It is complemented by the construction of a new section of the national road No. 47 of GP class on the section Rabka Zdrój – Chabówka with a length of 0.877 km, which connects the S7 expressway with the current national road No. 47. The beginning of the investment (km 71...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 12,741 bytes −2,541 Removed claim: summary (P836): The main part of the project is the construction of the S7 expressway from the Lubiach — Rabka section, which is located on the comprehensive TEN-T network with a total length of 15.830 km.The addition is a construction of a new section of national road No 47 of the class of the “Rabka Zdrój”, a section of 0.877 km long as the bridge between the S7 express road and the current national road No 47.The start of the investment (km 713 + 580) star...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 13,561 bytes +2,541 Created claim: summary (P836): The main part of the project is the construction of the S7 expressway from the Lubiach — Rabka section, which is located on the comprehensive TEN-T network with a total length of 15.830 km.The addition is a construction of a new section of national road No 47 of the class of the “Rabka Zdrój”, a section of 0.877 km long as the bridge between the S7 express road and the current national road No 47.The start of the investment (km 713 + 580) starts...

18 February 2020

8 February 2020

31 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)