Revision history of "Reconstruction of the S8 expressway Piotrków Trybunalski – Warsaw, odc. Radziejowice – w. Paszków" (Q85847)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 64,841 bytes −4 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 64,845 bytes −270 Set a claim value: summary (P836): O projeto consiste na extensão da estrada nacional n.o 8 aos parâmetros da via rápida S8 com um comprimento total de 21,52 km no troço de Radziejowice a Paszków, que está localizado numa rede global da RTE-T. O início do investimento foi realizado em km 420 + 100, a estrada nacional existente n.o 8 (no local de ligação ao n.o de cruzamento de Radziejowice. O trajeto, ao longo de toda a extensão, utiliza a via existente da estrada nacional n.o 8, abr...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 63,862 bytes +3,044 Changed label, description and/or aliases in da, it, sk, pt, hr, ga, et, fi, lv, fr, lt, ro, sv, es, hu, sl, mt, el, bg, cs, de, nl, and other parts

22 October 2022

13 August 2022

  • curprev 17:2517:25, 13 August 2022DG Regio talk contribs 59,995 bytes +35,617 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 15,437 bytes +2,103 Created claim: summary (P836): Le projet consiste en l’extension de la route nationale no 8 aux paramètres de l’autoroute S8 d’une longueur totale de 21,52 km sur le tronçon de Radjowice à Paszków, qui est situé dans le réseau global RTE-T. Le début de l’investissement a été adopté au km 420 + 100, la route nationale existante no 8 (à la place de la liaison avec la jonction «Radziejowice» située à l’intersection avec la route provinciale no 579 à Radziejowice), L’extrémité a...
  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 13,334 bytes +161 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,613 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,450 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,602 bytes +1,740 Created claim: summary (P836): The project consists of the extension of the national road No. 8 to the parameters of the S8 express road with a total length of 21.52 km on the section from Radziejowice to Paszków, which is located in a comprehensive network of TEN-T.The beginning of the investment was taken in km 420 + 100, the existing national road no. 8 (in the place of connection to the “Radziejowice junction” no. The route, over the entire length, uses the existing track...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 11,862 bytes −1,585 Removed claim: summary (P836): The project consists of the extension of national road No 8 to the parameters of the S8 expressway, with a total length of 21.52 km from the point of Radziejowice to M. Paszków, which is located on the comprehensive TEN-T.Start of the investment, was adopted at km 420 + 100, the existing national road No 8 (at the point where the ‘Radziejowice’ junction to the ‘Radziejowice junction’ situated at the intersection with the provincial road No 579...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 11,731 bytes +1,585 Created claim: summary (P836): The project consists of the extension of national road No 8 to the parameters of the S8 expressway, with a total length of 21.52 km from the point of Radziejowice to M. Paszków, which is located on the comprehensive TEN-T.Start of the investment, was adopted at km 420 + 100, the existing national road No 8 (at the point where the ‘Radziejowice’ junction to the ‘Radziejowice junction’ situated at the intersection with the provincial road No 579 w...

18 February 2020

8 February 2020

31 January 2020

14 January 2020