Revision history of "Reconstruction of St. Navy on odc. ul. Tape – ul. Of Rome" (Q85835)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 46,988 bytes −5 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 46,993 bytes +7 Set a claim value: summary (P836): O projeto consiste na reconstrução da rua. Marinha em fc. a partir de ul. Fita para o nó naval – Wołoska – Romeowski, em Varsóvia, no distrito de Mokotów (de acordo com o critério do POIiŚ – reconstrução de estradas no nó da cidade de Varsóvia da rede principal incluída nos planos dos corredores da rede RTE-T). A localização é apresentada a favor. 5 ao pedido de cofinanciamento.

22 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 44,231 bytes −29 Changed label, description and/or aliases in fr, lv, ro, da, it, sk, de, cs, es, bg, hr, fi, hu, et, sv, sl, pt, ga, nl, el, lt, mt, and other parts

22 October 2022

13 August 2022

  • curprev 17:2517:25, 13 August 2022DG Regio talk contribs 43,451 bytes +25,005 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 13,133 bytes +1,215 Created claim: summary (P836): Le projet consiste en la reconstruction d’ul. Section navale d’ul. Ruban à la jonction Marynarska — Wołoska — Rome à Varsovie dans le quartier de Mokotów (selon le critère OPI & E — reconstruction des routes dans le nœud urbain de Varsovie du réseau central inclus dans les plans de corridor du RTE-T). L’emplacement est indiqué à l’annexe. 5 à la demande de financement., translated_summary
  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 11,918 bytes +141 Changed label, description and/or aliases in fr: translated_label

26 December 2020

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 12,227 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 12,109 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 12,228 bytes +1,222 Created claim: summary (P836): The project consists of rebuilding the street. Navy on fc. from ul. Tape to the naval node – Wołoska – Romeowski in Warsaw in the district of Mokotów (according to the criterion of POIiŚ – reconstruction of roads in the Warsaw city node of the core network included in the plans of the corridors of the TEN-T network). The location is presented in favor. 5 to the Application for Co-financing., translated_summary
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 11,006 bytes −767 Removed claim: summary (P836): The project consists of the redevelopment of ul.The Navy has been on ul.The conveyor belt to the Marynarska interchange — Wooden — Rommowski in the Mokotów district in Warsaw (according to the OPI & E criterion — road reconstruction in the Warsaw urban nodes of the core network of the TEN-T network corridors).The location shall be provided in the Annex.5 to the Application for funding., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 10,065 bytes +767 Created claim: summary (P836): The project consists of the redevelopment of ul.The Navy has been on ul.The conveyor belt to the Marynarska interchange — Wooden — Rommowski in the Mokotów district in Warsaw (according to the OPI & E criterion — road reconstruction in the Warsaw urban nodes of the core network of the TEN-T network corridors).The location shall be provided in the Annex.5 to the Application for funding., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020