Revision history of "Modernisation of the Structure of St. Marsa – Soldiers’ Node Marsa – the border of the city – stage II" (Q85834)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 71,038 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 71,041 bytes +88 Set a claim value: summary (P836): O projecto consiste na modernização das ruas Marsa – Soldierska, no troço da junção de Marte (ul. Transnístria) até à fronteira da cidade. Estas ruas estão localizadas dentro da Estrada Voivodia No. 631 dentro dos limites de Varsóvia. Por toda a parte modernizada da rua. Marte, ou seja, de St. Nadnieprzańska até à intersecção com as ruas: Os soldados e recrutas foram concebidos para 4 estradas de duas pistas: 2 estradas principais (tráfego principal...

12 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 68,198 bytes −1,657 Changed label, description and/or aliases in fr, lv, it, sv, da, ro, de, cs, sk, fi, hr, es, bg, el, et, sl, hu, lt, mt, pt, nl, ga, and other parts

22 October 2022

13 August 2022

  • curprev 17:2517:25, 13 August 2022DG Regio talk contribs 69,041 bytes +43,134 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 16,221 bytes +2,349 Created claim: summary (P836): Le projet consiste en la modernisation de la rue Marsa — Ołnierska, sur le tronçon de la jonction Mars (ul. Naddnieprzańska) jusqu’à la frontière de la ville. Ces rues sont situées à l’intérieur de la route provinciale no 631 à l’intérieur des frontières de Varsovie. Dans l’ensemble, la section modernisée de l’ul. Marsa, c’est-à-dire d’ul. Transdnieprzańska jusqu’à l’intersection avec les rues: Soldat et recrutement ont été conçus 4 chaussées à...
  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 13,872 bytes +178 Changed label, description and/or aliases in fr: translated_label

26 December 2020

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 14,144 bytes +170 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,974 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 14,121 bytes +2,122 Created claim: summary (P836): The project consists of modernisation of Marsa – Soldierska Streets, on the section from Mars junction (ul. Transnistria) to the border of the city. These streets are located within the Voivodeship Road No. 631 within the limits of Warsaw. All over the modernised section of the street. Mars, i.e. from St. Nadnieprzańska to the intersection with the streets: The Soldiers and Recructs were designed for 4 two-lane roads: 2 main roads (head traffic)...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 11,999 bytes −1,722 Removed claim: summary (P836): The project consists of the modernisation of the streets of Mars — Żołnierska, on the section from the Marsa interchange (ul.Transnistrian border) to the border of the city.These streets are located within the provincial road No 631 within the borders of Warsaw.On the whole of the modernised section ul.Marsa, i.e. from ul.Transnistrian to the intersection with the streets:The Solernierska and ReRecruitment were designed with 4 dual carriageway...

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 12,002 bytes +1,722 Created claim: summary (P836): The project consists of the modernisation of the streets of Mars — Żołnierska, on the section from the Marsa interchange (ul.Transnistrian border) to the border of the city.These streets are located within the provincial road No 631 within the borders of Warsaw.On the whole of the modernised section ul.Marsa, i.e. from ul.Transnistrian to the intersection with the streets:The Solernierska and ReRecruitment were designed with 4 dual carriageways:...

18 February 2020

8 February 2020

31 January 2020

14 January 2020