Revision history of "Construction of the S7 expressway. Miłomłyn – Olsztynek" (Q85832)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 53,419 bytes +908 Changed label, description and/or aliases in ro, lv, it, da, fr, sv, fi, ga, sk, hu, bg, nl, de, mt, es, el, et, sl, cs, lt, hr, pt, and other parts

24 October 2022

13 August 2022

  • curprev 17:2517:25, 13 August 2022DG Regio talk contribs 51,322 bytes +29,039 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0521:05, 30 November 2021DG Regio talk contribs 14,945 bytes +1,591 Created claim: summary (P836): Le projet vise à construire l’autoroute S7 sur le tronçon Miłomłyn — Olsztynek. La longueur de la section de l’autoroute S7 est de 38,88 km. Un tronçon à deux voies avec deux voies, une voie de partage (y compris une réserve pour la troisième voie) et des voies d’urgence bilatérales sont prévus dans tout le tronçon. Sur le plan administratif, l’investissement est une sage-femme dans la partie nord de la Pologne entièrement dans la région de la v...
  • curprev 21:0521:05, 30 November 2021DG Regio talk contribs 13,354 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,674 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,556 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,677 bytes +1,463 Created claim: summary (P836): The project aims to build the S7 expressway at the section Miłomłyn – Olsztynek. The length of the S7 expressway is 38.88 km. There is a two-way cross-section with two lanes, a dividing lane (including a reserve for the third lane) and two lanes. Administratively, the investment is a midwife in the northern part of Poland entirely in the area of Warmia-Mazury Voivodeship. The analysed section of the S7 express road passes through the area of the...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 12,214 bytes −1,196 Removed claim: summary (P836): The project aims to build the S7 expressway on the section Miłosmill — Olsztynek.The length of the constructed section of the S7 expressway is 38.88 km.On the whole section there are two carriageways with two lanes, a dividing strip (including a third lane reserve) and a cross section.The investment is administratively located in the northern part of Poland as a whole in the Warmińsko-Mazurskie region.The section of the S7 expressway in questi...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 11,282 bytes +1,196 Created claim: summary (P836): The project aims to build the S7 expressway on the section Miłosmill — Olsztynek.The length of the constructed section of the S7 expressway is 38.88 km.On the whole section there are two carriageways with two lanes, a dividing strip (including a third lane reserve) and a cross section.The investment is administratively located in the northern part of Poland as a whole in the Warmińsko-Mazurskie region.The section of the S7 expressway in question...

18 February 2020

8 February 2020

31 January 2020

14 January 2020