Revision history of "Construction of the S8 express road, section of the century Marki – St. Radzymin South." (Q85827)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 23:2923:29, 2 March 2023DG Regio talk contribs 52,297 bytes +850 Changed label, description and/or aliases in da, sk, el, fi, ro, de, cs, bg, lv, ga, sv, lt, fr, es, hu, pt, sl, et, mt, hr, nl, it, and other parts

24 October 2022

26 July 2022

  • curprev 04:1604:16, 26 July 2022DG Regio talk contribs 50,633 bytes +29,389 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0521:05, 30 November 2021DG Regio talk contribs 14,841 bytes +1,510 Created claim: summary (P836): Le projet vise à construire l’autoroute S8 de la jonction «Marki» à la jonction «Radzymin PŁD» d’une longueur totale de 15,369 km. Un tronçon de route à deux voies avec trois voies et une voie d’urgence et une voie de séparation est prévu pour l’ensemble du tronçon de la route express. L’autoroute S8 prévue commence dans la ville de Marki à droite à la frontière avec Varsovie, d’où elle longe la frontière de Ząbki jusqu’à la ville de Zielonka. L...
  • curprev 21:0521:05, 30 November 2021DG Regio talk contribs 13,331 bytes +131 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,640 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,492 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,612 bytes +1,437 Created claim: summary (P836): The project aims at the construction of the S8 expressway from the “Marki” junction to the “Radzymin South” junction with a total length of 15.369 km. There is a two-way cross-section with three lanes and an emergency lane and a dividing lane across the entire section of the designed expressway. The design of the S8 expressway begins in the town of Marki near the border with Warsaw, from where it runs along the border of Ząbki to Zielonka. The p...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 12,175 bytes −1,060 Removed claim: summary (P836): The project aims at the construction of the S8 expressway from the “Marki” interchange to the “Radzyn South” interchange, with a total length of 15.369 km.The section of the proposed expressway provides a dual carriageway with a dual carriageway with three lanes, an emergency lane and a dividing strip.The design of the S8 express road begins in the city of Marki just at the border with Warsaw, where it runs along the border of the town of Ząbk...

23 September 2020

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5809:58, 4 March 2020DG Regio talk contribs 10,685 bytes +1,060 Created claim: summary (P836): The project aims at the construction of the S8 expressway from the “Marki” interchange to the “Radzyn South” interchange, with a total length of 15.369 km.The section of the proposed expressway provides a dual carriageway with a dual carriageway with three lanes, an emergency lane and a dividing strip.The design of the S8 express road begins in the city of Marki just at the border with Warsaw, where it runs along the border of the town of Ząbka...

18 February 2020

8 February 2020

31 January 2020

14 January 2020