Revision history of "Green areas in Bialystok – reconstruction of ponds at ul. Marczukowska with the construction of accompanying facilities" (Q85792)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 47,840 bytes −2 Changed label, description and/or aliases in pt
  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 47,842 bytes +17 Set a claim value: summary (P836): O objetivo do projeto é criar zonas verdes de acesso livre na cidade através da reconstrução de duas lagoas devastadas e poluídas, da construção de duas lagoas mais pequenas com as instalações hidrotécnicas necessárias, da plantação de vegetação e do desenvolvimento de terrenos, incluindo a criação de um percurso educativo natural.

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 44,294 bytes +301 Changed label, description and/or aliases in lv, it, da, sk, ga, cs, et, bg, mt, es, fi, ro, sv, hr, sl, pt, nl, hu, fr, lt, el, de, and other parts

21 October 2022

26 July 2022

  • curprev 04:1504:15, 26 July 2022DG Regio talk contribs 43,180 bytes +24,684 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 13,110 bytes +1,178 Created claim: summary (P836): L’objectif du projet est de créer des espaces verts accessibles au public dans la ville par la reconstruction de deux étangs dévastés et pollués, la construction de deux étangs plus petits avec les installations hydrotechniques nécessaires, la plantation de verdure et la gestion des terres, y compris la création d’un parcours éducatif naturel., translated_summary
  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 11,932 bytes +188 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4614:46, 14 October 2020DG Regio talk contribs 12,184 bytes +181 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4614:46, 14 October 2020DG Regio talk contribs 12,003 bytes −187 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4614:46, 14 October 2020DG Regio talk contribs 12,190 bytes +1,107 Created claim: summary (P836): The aim of the project is to create open-access green areas in the city by rebuilding devastated and polluted two ponds, building two smaller ponds with the necessary hydrotechnical facilities, planting greenery and land development, including the creation of a natural educational path., translated_summary
  • curprev 14:4614:46, 14 October 2020DG Regio talk contribs 11,083 bytes −676 Removed claim: summary (P836): The aim of the project is to create publicly accessible green spaces in the city by rebuilding two joint ponds, building two smaller ponds together with the necessary hydrotechnical facilities, carrying out a landscape of greenery and landscaping, including the creation of a natural educational pathway., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5809:58, 4 March 2020DG Regio talk contribs 10,042 bytes +676 Created claim: summary (P836): The aim of the project is to create publicly accessible green spaces in the city by rebuilding two joint ponds, building two smaller ponds together with the necessary hydrotechnical facilities, carrying out a landscape of greenery and landscaping, including the creation of a natural educational pathway., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020