Revision history of "Use of modern remote sensing technologies in the management of the natural resources of Gorczański National Park and analysis of the current state and dynamics of protected ecosystems" (Q85516)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 91,415 bytes +3 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 91,412 bytes +40 Set a claim value: summary (P836): o principal objetivo do projeto é preparar as instalações para a utilização de técnicas modernas de teledeteção a longo prazo da GPN e avaliar o estado dos ecossistemas do parque e a dinâmica das alterações que neles ocorrem. O projeto abrange a área do GPN e as suas imediações (Zal. 3. O parque ocupa atualmente 7029,85 hectares. Mais de 97% da sua superfície é um complexo compacto, cobrindo os locais mais altos de Gorce, e a percentagem restante é...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:5716:57, 2 March 2023DG Regio talk contribs 87,841 bytes −868 Changed label, description and/or aliases in lv, it, da, sk, sl, fi, et, de, pt, ro, fr, lt, sv, nl, mt, bg, cs, el, hr, es, ga, hu, and other parts

21 October 2022

26 July 2022

  • curprev 04:1004:10, 26 July 2022DG Regio talk contribs 87,893 bytes +56,671 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 18,446 bytes +3,041 Created claim: summary (P836): L’objectif principal du projet est de préparer les installations à l’utilisation des techniques modernes de télédétection dans les activités du GPN à long terme et d’évaluer l’état des écosystèmes du parc et la dynamique des changements qui s’y produisent. Le projet couvre la zone du GPN et ses environs immédiats (zał. 3). Le parc occupe actuellement 7 029,85 ha. Plus de 97 % de sa surface est un complexe compact, couvrant les emplacements les p...
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 15,405 bytes +270 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 16:4516:45, 14 October 2020DG Regio talk contribs 15,575 bytes +244 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4516:45, 14 October 2020DG Regio talk contribs 15,331 bytes −248 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4516:45, 14 October 2020DG Regio talk contribs 15,579 bytes +2,814 Created claim: summary (P836): the main objective of the project is to prepare the facilities for the use of modern remote sensing techniques in the long term of GPN and to assess the state of the park ecosystems and the dynamics of changes occurring within them. The project covers the area of GPN and its immediate surroundings (Zał. 3. The park currently occupies 7029.85 hectares. More than 97 % of its surface is a compact complex, covering the highest locations of Gorce, an...
  • curprev 16:4516:45, 14 October 2020DG Regio talk contribs 12,765 bytes −2,244 Removed claim: summary (P836): the main objective of the project is to prepare the facilities for the use of modern remote sensing techniques in GPN’s activities in the long term and to assess the status of the Park’s ecosystems and the dynamics of changes within them.The project covers the GPN area and its immediate surroundings (Enclosure.EUR 3).The park currently occupies 7 029.85 ha.More than 97 % of its surface is a compact complex, with the highest positions of Gornic...

15 July 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:4909:49, 4 March 2020DG Regio talk contribs 13,287 bytes +2,244 Created claim: summary (P836): the main objective of the project is to prepare the facilities for the use of modern remote sensing techniques in GPN’s activities in the long term and to assess the status of the Park’s ecosystems and the dynamics of changes within them.The project covers the GPN area and its immediate surroundings (Enclosure.EUR 3).The park currently occupies 7 029.85 ha.More than 97 % of its surface is a compact complex, with the highest positions of Gornicy,...

18 February 2020

8 February 2020

31 January 2020

14 January 2020