Revision history of "Water and sewage management in the municipality of Skawina – Stage II" (Q85495)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 47,779 bytes +16 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 47,763 bytes +12 Set a claim value: summary (P836): O projeto inclui a construção de um sistema de esgoto sanitário por gravidade com um comprimento total de 22,72 km e um sistema de prensagem com um comprimento total de 11,93 km na área da aglomeração de Skawina, bem como a reconstrução do SUW em Skawina. Em resultado do projeto, serão ligados 4 242 novos utilizadores da rede de esgotos e a água será tratada no montante de 3071277 m3/ano.

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 44,220 bytes −181 Changed label, description and/or aliases in lv, da, sk, ro, fr, sv, fi, hr, sl, et, ga, de, mt, hu, lt, bg, pt, nl, es, cs, el, and other parts

21 October 2022

26 July 2022

  • curprev 04:1004:10, 26 July 2022DG Regio talk contribs 43,587 bytes +25,040 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5820:58, 30 November 2021DG Regio talk contribs 13,181 bytes +1,233 Created claim: summary (P836): Le projet comprend la construction d’un réseau d’assainissement par gravité d’une longueur totale de 22,72 km et d’une station de presse d’une longueur totale de 11,93 km dans la zone de l’agglomération de Skawina, ainsi que la reconstruction du SUW à Skawina. Grâce au projet, 4 242 nouveaux utilisateurs du réseau d’assainissement seront raccordés et 3 071 277 m³/an seront traités., translated_summary
  • curprev 20:5820:58, 30 November 2021DG Regio talk contribs 11,948 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 16:4516:45, 14 October 2020DG Regio talk contribs 12,246 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4516:45, 14 October 2020DG Regio talk contribs 12,116 bytes −124 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4516:45, 14 October 2020DG Regio talk contribs 12,240 bytes +1,218 Created claim: summary (P836): The project includes the construction of a gravity sanitary sewer system with a total length of 22.72 km and a pressing system with a total length of 11.93 km in the area of the Skawina agglomeration, as well as the reconstruction of the SUW in Skawina. As a result of the project, 4 242 new users of the sewage network will be connected and water will be treated in the amount of 3071277 m³/year., translated_summary
  • curprev 16:4516:45, 14 October 2020DG Regio talk contribs 11,022 bytes −744 Removed claim: summary (P836): The project involves the construction of a gravitational sewage system with a total length of 22.72 km and a piston of a total length of 11.93 km in the Skaw agglomeration area and a reconstruction of the SUW in Skuina.As a result of the project, 4 242 new users of the sewer network will be connected and the water will be treated in a quantity of 3 071 277 m³/yr., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:4909:49, 4 March 2020DG Regio talk contribs 10,056 bytes +744 Created claim: summary (P836): The project involves the construction of a gravitational sewage system with a total length of 22.72 km and a piston of a total length of 11.93 km in the Skaw agglomeration area and a reconstruction of the SUW in Skuina.As a result of the project, 4 242 new users of the sewer network will be connected and the water will be treated in a quantity of 3 071 277 m³/yr., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020