Revision history of "Ordering water and sewage management in the city of Sulejówek – Stage II" (Q85486)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 47,478 bytes +227 Changed label, description and/or aliases in da, sk, it, sv, lv, fi, sl, ro, de, cs, pt, lt, hr, nl, es, hu, bg, ga, et, mt, el, and other parts

21 October 2022

13 August 2022

  • curprev 17:2217:22, 13 August 2022DG Regio talk contribs 46,441 bytes +26,879 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5820:58, 30 November 2021DG Regio talk contribs 13,563 bytes +1,423 Created claim: summary (P836): Le champ d’application indiqué dans la demande est conforme à Master Pan — PLMZ044 et KPOŚK Le champ d’application matériel du projet en question consiste en vingt-huit tâches indépendantes à réaliser entre 2016 et 2023. L’objet du projet est la conception et la construction d’un réseau d’alimentation en eau et d’un réseau d’assainissement sanitaire ainsi que la modernisation de la station d’épuration des eaux usées (construction d’un système d’...
  • curprev 20:5820:58, 30 November 2021DG Regio talk contribs 12,140 bytes +152 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 12,428 bytes +134 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 12,294 bytes −129 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 12,423 bytes +1,284 Created claim: summary (P836): The scope of the proposal is consistent with Master Pan – PLMZ044 and KPOŚK The project’s material scope consists of twenty-eight independent tasks to be carried out between 2016 and 2023. The subject of the project is the design and construction of a water supply network and sanitary sewage system with the modernisation of the sewage treatment plant (construction of an additional enn power system using photovoltaic panels) and purchase of the G...
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 11,139 bytes −834 Removed claim: summary (P836): The scope of the proposal is in line with the Master of the project — PLMZ044 and KPOŚK. the project is composed of twenty eight independent tasks to be performed in 2016-2023.The project concerns the design and construction of a water supply network and a sewerage network with the modernisation of the sewage treatment plant (construction of an additional system for the power supply of the ESO using photovoltaic panels) and the purchase of the...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:4909:49, 4 March 2020DG Regio talk contribs 10,261 bytes +834 Created claim: summary (P836): The scope of the proposal is in line with the Master of the project — PLMZ044 and KPOŚK. the project is composed of twenty eight independent tasks to be performed in 2016-2023.The project concerns the design and construction of a water supply network and a sewerage network with the modernisation of the sewage treatment plant (construction of an additional system for the power supply of the ESO using photovoltaic panels) and the purchase of the G...

18 February 2020

8 February 2020

31 January 2020

14 January 2020