Revision history of "Programme to improve the cleanliness of the river Wisłoki river basin – Stage III" (Q85476)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 61,553 bytes −722 Changed label, description and/or aliases in da, it, fi, sk, bg, cs, de, pt, ro, lv, et, fr, sl, es, ga, sv, hu, mt, el, nl, lt, hr, and other parts

21 October 2022

26 July 2022

  • curprev 04:0904:09, 26 July 2022DG Regio talk contribs 61,100 bytes +36,216 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 17,651 bytes +1,916 Created claim: summary (P836): Le projet sera mis en œuvre dans l’agglomération dans trois agglomérations: — Jasło o p. 82 442, désigné par la résolution XXVII/486/16 du 26 septembre 2016; — Jedlicze avec un EH du 11 137, désigné par la résolution XLIV/906/14 du 31 mars 2014; — Biecz o p.e. 10 184 désigné par la résolution VI/62/15 du 23 février 2015 Le champ d’application matériel du projet est: — nombre d’installations de traitement des eaux urbaines résiduaires construites...
  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 15,735 bytes +158 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 16,017 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 15,874 bytes −154 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 16,028 bytes +1,749 Created claim: summary (P836): The project will be implemented in the agglomeration area of three agglomerations: — Jasło o RLM 82 442, designated by Resolution XXVII/486/16 of 26 September 2016; — Jedlicze o RLM 11 137, designated by Resolution XLIV/906/14 of 31 March 2014; — Biecz o RLM 10 184 designated by Resolution VI/62/15 of 23 February 2015 The scope of the project is: — number of urban waste water treatment plants built or modernised – pcs. 1 – length of built sanita...
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 14,279 bytes −1,211 Removed claim: summary (P836): The project will be carried out in agglomerations within three agglomerations:— Jasło with a p.e. of 82 442, as designated by Resolution XXVII/486/16 of 26 September 2016;— One number 11 137 p.e., as designated by Resolution XLIV/906/14 of 31 March 2014;— Belicz with a p.e. of 10 184, designated by Resolution VI/62/15 of 23 February 2015.Number of urban waste water treatment plants built or upgraded:1 — length of sewage system built (km) — 13....

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1310:13, 4 March 2020DG Regio talk contribs 12,540 bytes +1,211 Created claim: summary (P836): The project will be carried out in agglomerations within three agglomerations:— Jasło with a p.e. of 82 442, as designated by Resolution XXVII/486/16 of 26 September 2016;— One number 11 137 p.e., as designated by Resolution XLIV/906/14 of 31 March 2014;— Belicz with a p.e. of 10 184, designated by Resolution VI/62/15 of 23 February 2015.Number of urban waste water treatment plants built or upgraded:1 — length of sewage system built (km) — 13.84...

18 February 2020

8 February 2020

31 January 2020

14 January 2020