Revision history of "Water and sewage management in the city of Żyrardów – Stage III" (Q85474)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 65,985 bytes +8 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 65,977 bytes +14 Set a claim value: summary (P836): O projeto será executado na aglomeração de Gyrardów 54 132 RLM. O âmbito material do projeto é o seguinte: —Comprimento do sistema de esgotos sanitários construído-13,54 km -Comprimento do abastecimento de água- 2,97 km -Número de estações de tratamento de esgotos municipais reconstruídas-1peças. —Número de estações de tratamento de águas residuais urbanas apoiadas pelo tratamento/gestão de lamas de depuração – 1 pcs. —Número de sistemas de gestão i...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 62,432 bytes +616 Changed label, description and/or aliases in it, da, sk, ga, fi, et, hr, de, el, bg, lv, fr, sv, pt, cs, es, nl, ro, hu, lt, sl, mt, and other parts

21 October 2022

26 July 2022

  • curprev 04:0904:09, 26 July 2022DG Regio talk contribs 61,001 bytes +37,154 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 15,349 bytes +2,063 Created claim: summary (P836): Le projet sera mis en œuvre dans l’agglomération de l’agglomération 54 132 EH. Le champ d’application du projet est: — Longueur des égouts sanitaires construit-13,54 km -Longueur du réseau d’approvisionnement en eau-2,97 km -Nombre d’installations de traitement des eaux urbaines résiduaires reconstruites-1pcs. —Nombre d’installations de traitement des eaux urbaines résiduaires soutenues dans le traitement/gestion des boues d’épuration-1pcs. —Nom...
  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 13,286 bytes +138 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 13,588 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 13,462 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 13,580 bytes +1,840 Created claim: summary (P836): The project will be implemented in the Gyrardów agglomeration 54 132 RLM. The material scope of the project is: —Length of built sanitary sewage system-13.54 km -Length of water supply- 2,97 km -Number of reconstructed municipal sewage treatment plants-1pieces. —Number of municipal waste water treatment plants supported by the treatment/management of sewage sludge – 1pcs. —Number of implemented intelligent management systems for water and sewage...
  • curprev 16:4416:44, 14 October 2020DG Regio talk contribs 11,740 bytes −1,360 Removed claim: summary (P836): The project will be implemented in the Żyrardów agglomeration 54 132 p.e.The scope of the project is:— Length of the built sanitary sewage system — 13.54 km — 2.97 km of water supply and number of reconstructed urban waste water treatment plants (1).— Number of urban waste water treatment plants supported by sewage sludge treatment/management (1°).— Number of smart systems for management of water and wastewater management systems (1)— Number o...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1310:13, 4 March 2020DG Regio talk contribs 11,383 bytes +1,360 Created claim: summary (P836): The project will be implemented in the Żyrardów agglomeration 54 132 p.e.The scope of the project is:— Length of the built sanitary sewage system — 13.54 km — 2.97 km of water supply and number of reconstructed urban waste water treatment plants (1).— Number of urban waste water treatment plants supported by sewage sludge treatment/management (1°).— Number of smart systems for management of water and wastewater management systems (1)— Number of...

18 February 2020

8 February 2020

31 January 2020

14 January 2020