Revision history of "Construction of sewage system in Otmuchów – stages III and IV" (Q85432)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 40,541 bytes −22 Changed label, description and/or aliases in it, lv, da, sk, ga, fi, de, sv, cs, et, bg, ro, mt, es, fr, pt, hr, hu, sl, nl, el, lt, and other parts

21 October 2022

26 July 2022

  • curprev 04:0804:08, 26 July 2022DG Regio talk contribs 39,758 bytes +22,296 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5720:57, 30 November 2021DG Regio talk contribs 12,698 bytes +1,105 Created claim: summary (P836): Le projet comprend: — construction de 4,3 km de réseau d’assainissement et raccordement de 402 personnes; — construction de 0,28 km de réseau d’approvisionnement en eau et raccordement de 20 personnes; — reconstruction de 0,52 km du réseau d’approvisionnement en eau., translated_summary
  • curprev 20:5720:57, 30 November 2021DG Regio talk contribs 11,593 bytes +149 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1310:13, 4 March 2020DG Regio talk contribs 9,727 bytes +612 Created claim: summary (P836): The project includes:Construction of 4.3 km of sanitary sewage system and 402 km of sanitary sewerage system;Construction of 0.28 km of water supply network and connection of 20 persons;Reconstruction of 0.52 km of water supply network., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020