Revision history of "Sanitary sewage and sewage treatment plant in Staszów – Stage II" (Q85412)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 47,637 bytes −37 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 47,674 bytes −5 Set a claim value: summary (P836): O projeto será executado na voivodia de Świętokrzyskie, na aglomeração de Staszów (29 219 RLM). Como parte do projeto, um sistema de esgoto sanitário com um comprimento de 33 km e uma nova estação de tratamento biológico-mecânico de esgotos com capacidade Qśrd = 400 m3/d (4.200 RLM) serão construídos na cidade de Big Belt. Como resultado do projeto, 3.515 RLM serão ligados.

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0923:09, 2 March 2023DG Regio talk contribs 44,148 bytes −145 Changed label, description and/or aliases in sk, it, fi, bg, de, lv, et, cs, pt, ro, fr, ga, sl, es, hu, sv, el, mt, lt, nl, hr, da, and other parts

21 October 2022

26 July 2022

  • curprev 04:0804:08, 26 July 2022DG Regio talk contribs 43,476 bytes +24,763 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5720:57, 30 November 2021DG Regio talk contribs 13,254 bytes +1,242 Created claim: summary (P836): Le projet sera mis en œuvre dans la voïvodie de Świętokrzyskie, dans l’agglomération de Staszów (29.219 p.e.). Le projet permettra la construction d’un système d’assainissement sanitaire d’une longueur de 33 km et d’une nouvelle station d’épuration biomécanique d’une capacité de Qśrd = 400 m³/j (4200 EH) dans le village de Wiązownica Duża. À la suite du projet, 3.515 EH seront connectés., translated_summary
  • curprev 20:5720:57, 30 November 2021DG Regio talk contribs 12,012 bytes +175 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,277 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,151 bytes −158 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,309 bytes +1,194 Created claim: summary (P836): The project will be implemented in Świętokrzyskie Voivodship, in the Staszów agglomeration (29.219 RLM). As part of the project, a sanitary sewage system with a length of 33 km and a new biological-mechanical sewage treatment plant with Qśrd capacity = 400 m³/d (4.200 RLM) will be built in the town of Big Belt. As a result of the project, 3.515 RLM will be connected., translated_summary
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 11,115 bytes −733 Removed claim: summary (P836): The project will be implemented in Świętokrzyskie Province, in the agglomeration of Staszów (29.219 p.e.).The project will build a 33 km long sanitary sewerage system and a new biological and mechanical wastewater treatment plant with a capacity of Qwrd = 400 m³/d (4.200 p.e.) in Vązownica Duża.As a result of the project, 3.515 p.e. will be connected., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 10,131 bytes +733 Created claim: summary (P836): The project will be implemented in Świętokrzyskie Province, in the agglomeration of Staszów (29.219 p.e.).The project will build a 33 km long sanitary sewerage system and a new biological and mechanical wastewater treatment plant with a capacity of Qwrd = 400 m³/d (4.200 p.e.) in Vązownica Duża.As a result of the project, 3.515 p.e. will be connected., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020