Revision history of "Extension of waste water treatment plant in Leżajsk with extension and reconstruction of associated infrastructure and improvement of network asset management" (Q85405)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 52,397 bytes −7 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 52,404 bytes −7 Set a claim value: summary (P836): O projeto abrange principalmente atividades relacionadas com a ampliação da estação de tratamento de águas residuais de Leżajsk, bem como a ampliação e reconstrução da infraestrutura associada. Tal resultará num aumento do rendimento da estação de tratamento expresso em RLM, o que garantirá que as águas residuais sejam tratadas a um nível adequado, apesar das grandes descargas periódicas de águas residuais com uma elevada carga de poluentes. Além di...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:1522:15, 2 March 2023DG Regio talk contribs 50,380 bytes −229 Changed label, description and/or aliases in da, it, sk, es, lv, ga, el, hu, fi, fr, bg, et, sv, de, sl, ro, pt, lt, cs, hr, mt, nl, and other parts

21 October 2022

13 August 2022

  • curprev 17:2217:22, 13 August 2022DG Regio talk contribs 49,794 bytes +29,474 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 13,841 bytes +1,372 Created claim: summary (P836): Le champ d’application du projet couvre principalement les activités liées à l’extension de la station d’épuration des eaux usées à Leżajsk et à l’extension et à la reconstruction des infrastructures d’accompagnement. En conséquence, la capacité de la station d’épuration, exprimée en EH, sera augmentée, garantissant ainsi un traitement approprié des eaux usées, malgré des rejets périodiques importants d’eaux usées à forte charge polluante. En ou...
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 12,469 bytes +260 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,649 bytes +219 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,430 bytes −240 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,670 bytes +1,311 Created claim: summary (P836): The project covers mainly activities related to the extension of the sewage treatment plant in Leżajsk, as well as the extension and reconstruction of the associated infrastructure. This will result in increased throughput of the treatment plant expressed in RLM, which will ensure that waste water is treated at an appropriate level, despite periodic large discharges of waste water with a high load of pollutants. In addition, an intelligent netwo...
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 11,359 bytes −855 Removed claim: summary (P836): In particular, the scope of the project is the extension of the waste water treatment plant in Leżajsk and the extension and reconstruction of the infrastructure.As a result, the capacity of the treatment plant expressed in p.e. will be increased and, as a consequence, will ensure that waste water is treated at an appropriate level, despite the periodic large discharges of waste water with high levels of pollution.In addition, a smart grid man...

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 10,492 bytes +855 Created claim: summary (P836): In particular, the scope of the project is the extension of the waste water treatment plant in Leżajsk and the extension and reconstruction of the infrastructure.As a result, the capacity of the treatment plant expressed in p.e. will be increased and, as a consequence, will ensure that waste water is treated at an appropriate level, despite the periodic large discharges of waste water with high levels of pollution.In addition, a smart grid manag...

18 February 2020

8 February 2020

31 January 2020

14 January 2020