Revision history of "Comprehensive order of water and sewage management in the Bodzanów Municipality" (Q85403)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 48,838 bytes −13 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 48,851 bytes +3 Set a claim value: summary (P836): O projeto inclui a ampliação da estação de tratamento de águas residuais localizada em Bodzanów. Como resultado da expansão, o rendimento da estação de tratamento aumentará de 1700 RLM para 3780 RLM. O projeto prevê igualmente a construção de um sistema de esgotos sanitários em Bodzanów, Chodkowo e Chodkowo-Działki, com uma extensão total de 15,85 km. 1913 novos utilizadores de saneamento serão ligados à nova rede.

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 45,317 bytes +114 Changed label, description and/or aliases in da, it, sk, lv, fi, ga, ro, et, sv, sl, cs, mt, de, hr, lt, el, bg, es, hu, nl, pt, fr, and other parts

21 October 2022

13 August 2022

  • curprev 17:2217:22, 13 August 2022DG Regio talk contribs 44,393 bytes +25,516 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 13,299 bytes +1,303 Created claim: summary (P836): Le projet comprend l’extension d’une station d’épuration des eaux usées située à Bodzanów. À la suite de l’expansion, la capacité de la station de traitement passera de 1700 à 3780 EH. Le projet prévoit également la construction d’un réseau d’assainissement sanitaire à Bodzanów, Chodkowo et Chodkowo-Działka d’une longueur totale de 15,85 km. 1913 nouveaux utilisateurs du système d’assainissement seront connectés au réseau nouvellement construit....
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 11,996 bytes +150 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,286 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,147 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,302 bytes +1,214 Created claim: summary (P836): The project includes the extension of the sewage treatment plant located in Bodzanów. As a result of the expansion, the throughput of the treatment plant will increase from 1700 RLM to 3780 RLM. The project also plans to build a sanitary sewer system in Bodzanów, Chodkowo and Chodkowo-Działki, with a total length of 15.85 km. 1913 new sanitation users will be connected to the new network., translated_summary
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 11,088 bytes −788 Removed claim: summary (P836): The project involves an extension of the wastewater treatment plant which is located in Bozanów.As a result of the extension, the capacity of the plant will increase from 1700 p.e. to 3780 p.e..In the framework of the project, it is also planned to construct a sewerage network in Bozanów, Chodkowo and Choodjące with a total length of 15.85 km.1913 new sewage users will be connected to the newly built network., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 10,159 bytes +788 Created claim: summary (P836): The project involves an extension of the wastewater treatment plant which is located in Bozanów.As a result of the extension, the capacity of the plant will increase from 1700 p.e. to 3780 p.e..In the framework of the project, it is also planned to construct a sewerage network in Bozanów, Chodkowo and Choodjące with a total length of 15.85 km.1913 new sewage users will be connected to the newly built network., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020