Revision history of "Extension of sanitary and water supply networks in the agglomeration Międzyrzec Podlaski" (Q85402)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 61,583 bytes +4 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 61,579 bytes −47 Set a claim value: summary (P836): O âmbito técnico do projeto inclui: 1. Construção de uma rede de abastecimento de água, 2. Construção de sistema de esgoto sanitário, 3. Construção de 8 estações de bombagem de águas residuais, 4. instalação fotovoltaica de 20 kW no edifício SUW e instalação fotovoltaica de 12 kW na estação de tratamento de águas residuais, 5. Aquisição dos equipamentos necessários para assegurar o bom funcionamento do abastecimento de água e do canal sanitário real...

20 March 2024

15 January 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 58,095 bytes +762 Changed label, description and/or aliases in da, lv, it, sk, bg, cs, fr, hu, pt, fi, mt, hr, ro, sv, ga, el, lt, et, nl, es, de, sl, and other parts

21 October 2022

26 July 2022

  • curprev 04:0704:07, 26 July 2022DG Regio talk contribs 56,525 bytes +33,809 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 14,847 bytes +1,896 Created claim: summary (P836): Le champ d’application du projet, sur le plan technique, comprend: 1. Construction d’un réseau d’approvisionnement en eau, 2. Construction d’un réseau d’assainissement sanitaire, 3. Construction de 8 stations de pompage des eaux usées, 4. Exécution d’une installation photovoltaïque de 20 kW sur le bâtiment SUW et d’une installation photovoltaïque de 12 kW sur le bâtiment de la station d’épuration des eaux usées, 5. Achat de l’équipement nécessai...
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 12,951 bytes +200 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 13,191 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 13,043 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 13,203 bytes +1,633 Created claim: summary (P836): The project’s technical scope includes: 1. Construction of a water supply network, 2. Construction of sanitary sewage system, 3. Construction of 8 sewage pumping stations, 4. 20 kW photovoltaic installation on the SUW building and 12 kW photovoltaic installation on sewage treatment plant, 5. Purchase of equipment necessary to ensure the proper functioning of the water supply and sanitary canal carried out within the framework of the project (pre...
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 11,570 bytes −1,226 Removed claim: summary (P836): The project, in its technical scope, includes:1.Construction of water supply network, 2.Construction of the sanitary sewerage network, 3.Construction of 8 wastewater pumping stations, 4.Installation of a 20 kW photovoltaic installation on the SUW building and a 12 kW photovoltaic installation at the Building Sewage Treatment Building, 5.Purchase of equipment necessary to ensure the proper functioning of the water and health services provided b...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 11,079 bytes +1,226 Created claim: summary (P836): The project, in its technical scope, includes:1.Construction of water supply network, 2.Construction of the sanitary sewerage network, 3.Construction of 8 wastewater pumping stations, 4.Installation of a 20 kW photovoltaic installation on the SUW building and a 12 kW photovoltaic installation at the Building Sewage Treatment Building, 5.Purchase of equipment necessary to ensure the proper functioning of the water and health services provided by...

18 February 2020

8 February 2020

31 January 2020

14 January 2020