Revision history of "Development of the sewage treatment plant in Dobre commune of Dobre dz. No. 107, Zdrojówka district with the construction of sanitary sewage system in Dobre" (Q85399)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 50,917 bytes −19 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 50,936 bytes +6 Set a claim value: summary (P836): O projeto inclui a ampliação da estação de tratamento de águas residuais localizada no distrito de Good, Zdrojówka. Como resultado da expansão, o rendimento da estação de tratamento aumentará de 1590 RLM para 2960 RLM. O projeto prevê igualmente a construção de um sistema de esgotos sanitários em m. Bom com um comprimento total de 1,85 km. 125 novos utilizadores de saneamento serão ligados à rede recém-construída.

20 March 2024

15 January 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:2120:21, 2 March 2023DG Regio talk contribs 47,399 bytes +409 Changed label, description and/or aliases in lv, it, sk, da, cs, et, el, fr, hu, fi, ga, ro, bg, lt, nl, hr, sv, mt, sl, es, de, pt, and other parts

21 October 2022

26 July 2022

  • curprev 04:0704:07, 26 July 2022DG Regio talk contribs 46,178 bytes +26,883 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 13,488 bytes +1,286 Created claim: summary (P836): Le projet comprend l’extension d’une station d’épuration des eaux usées située dans la ville de Good, Zdrojówka. À la suite de l’expansion, la capacité de la station de traitement passera de 1590 à 2960 EH. Le projet prévoit également la construction d’un réseau d’assainissement sanitaire à Good d’une longueur totale de 1,85 km. 125 nouveaux utilisateurs du système d’assainissement seront connectés au réseau nouvellement construit., translated_s...
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 12,202 bytes +245 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5515:55, 14 October 2020DG Regio talk contribs 12,397 bytes +217 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5515:55, 14 October 2020DG Regio talk contribs 12,180 bytes −231 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5515:55, 14 October 2020DG Regio talk contribs 12,411 bytes +1,205 Created claim: summary (P836): The project includes the extension of the sewage treatment plant located in the Good, Zdrojówka district. As a result of the expansion, the throughput of the treatment plant will increase from 1590 RLM to 2960 RLM. The project also plans to build a sanitary sewer system in m. Good with a total length of 1.85 km. 125 new sanitation users will be connected to the newly built network., translated_summary
  • curprev 15:5515:55, 14 October 2020DG Regio talk contribs 11,206 bytes −781 Removed claim: summary (P836): The project consists of an extension of the wastewater treatment plant located in m. good, Zdrojówka.As a result of the extension, the capacity of the plant will increase from 1590 p.e. to 2960 p.e..In the framework of the project, the construction of a sewerage network is planned to be constructed in m. good for a total length of 1.85 km.125 new sewage users will be connected to the newly built network., remove_old_english_translation

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 10,268 bytes +781 Created claim: summary (P836): The project consists of an extension of the wastewater treatment plant located in m. good, Zdrojówka.As a result of the extension, the capacity of the plant will increase from 1590 p.e. to 2960 p.e..In the framework of the project, the construction of a sewerage network is planned to be constructed in m. good for a total length of 1.85 km.125 new sewage users will be connected to the newly built network., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020