Revision history of "Ordering water and sewage management in the municipality of Zawoja – Stage II" (Q85398)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 50,329 bytes +38 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 50,291 bytes −15 Set a claim value: summary (P836): A execução do projeto resulta da necessidade de prosseguir a fase I do tratamento das águas residuais domésticas dos edifícios existentes e previstos no município de Zawoja. O âmbito do projeto inclui: — construção de cerca de 3,9 km de rede de esgotos, no percurso da rede está prevista a instalação de uma estação de bombagem no lugar da estação de tratamento de esgotos de Zawoja-Widły liquidada, — liquidação da estação de tratamento de esgotos de Z...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:0321:03, 2 March 2023DG Regio talk contribs 48,275 bytes −558 Changed label, description and/or aliases in it, da, lv, sk, et, hr, ro, sv, fi, hu, sl, fr, pt, lt, de, el, ga, nl, mt, es, bg, cs, and other parts

21 October 2022

26 July 2022

  • curprev 04:0704:07, 26 July 2022DG Regio talk contribs 48,025 bytes +28,323 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 13,664 bytes +1,423 Created claim: summary (P836): La mise en œuvre du projet résulte de la nécessité de poursuivre le traitement de la phase I des eaux usées domestiques à partir du développement existant et prévu dans la municipalité de Zawoja. La portée du projet comprend: — construction d’environ 3,9 km de réseau d’assainissement, sur l’itinéraire du réseau, une station de pompage des eaux usées est prévue sur le site de la station d’épuration de Zawoja-Widły déclassée, — déclassement de la...
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 12,241 bytes +134 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5515:55, 14 October 2020DG Regio talk contribs 12,547 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5515:55, 14 October 2020DG Regio talk contribs 12,409 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5515:55, 14 October 2020DG Regio talk contribs 12,534 bytes +1,374 Created claim: summary (P836): The implementation of the project results from the necessity of continuing phase I of the treatment of household waste water from the existing and planned buildings in the municipality of Zawoja. The scope of the project includes: — construction of approximately 3.9 km of sewage network, on the network route one pumping plant is planned to plant in the place of the liquidated Zawoja-Widły sewage treatment plant, – liquidation of Zawoja-Widły sew...
  • curprev 15:5515:55, 14 October 2020DG Regio talk contribs 11,160 bytes −917 Removed claim: summary (P836): The project results from the need to continue the stage I treatment of domestic waste water from the existing and planned building in the municipality of Zawoja.The scope of the project includes:— construction of about 3.9 km of sewerage network, on the route of the network, one sewage pumping station is planned to take place at the site of the decommissioned wastewater treatment plant, Zawiojum-Width, — decommissioning of the wastewater treat...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 10,359 bytes +917 Created claim: summary (P836): The project results from the need to continue the stage I treatment of domestic waste water from the existing and planned building in the municipality of Zawoja.The scope of the project includes:— construction of about 3.9 km of sewerage network, on the route of the network, one sewage pumping station is planned to take place at the site of the decommissioned wastewater treatment plant, Zawiojum-Width, — decommissioning of the wastewater treatme...

18 February 2020

8 February 2020

31 January 2020

14 January 2020