Revision history of "Extension and reconstruction (modernisation) of the sewage treatment plant in Sierpc" (Q85391)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 80,786 bytes −42 Set a claim value: summary (P836): O projecto previsto consistirá na ampliação e reconstrução (modernização) da estação de tratamento de águas residuais. Serão incluídas no investimento previsto as seguintes tarefas principais: 1. Sedimentação com recuperação de energia de biogás: a) Tecnologias de tratamento de lamas, incluindo: • Modernização das estações de bombagem de águas residuais brutas; • Modernizar o processo de pré-sedimentação através da introdução de colonos horizontais...

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

21 October 2022

13 August 2022

  • curprev 17:2217:22, 13 August 2022DG Regio talk contribs 75,271 bytes +47,505 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 17,035 bytes +2,700 Created claim: summary (P836): Le projet envisagé consistera en l’extension et la reconstruction (mise à niveau) de la station d’épuration des eaux usées. Les principales tâches suivantes seront incluses dans le champ d’application de l’investissement prévu: 1. Commande de gosp.sedidium avec récupération d’énergie à partir du biogaz: a) Technologie de traitement des sédiments, y compris: • Modernisation de la station de pompage des eaux usées brutes; • Modernisation du proces...
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 14,335 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 14,633 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 14,490 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 14,630 bytes +2,327 Created claim: summary (P836): The planned project will consist of the extension and reconstruction (modernisation) of the sewage treatment plant. The following main tasks will be included in the planned investment: 1. Sedimentation with biogas energy recovery: a) Sludge processing technology, including: • Modernisation of raw sewage pumping plants; • Modernising the pre-sedimentation process by introducing horizontal settlers and adapting Imhoff settlers excluded from operat...
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 12,303 bytes −1,894 Removed claim: summary (P836): The planned project will be to expand and rebuild (upgrade) the waste water treatment plant.The following main tasks will be included in the scope of the planned investment:1.Cleaning up of the sludge with energy recovery from the biogas:a) sludge technology, including:• Modernisation of raw sewage pumping stations;• Modernisation of primary sedimentation through the introduction of horizontal settlers and the adaptation of the Imhoff septic t...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 12,478 bytes +1,894 Created claim: summary (P836): The planned project will be to expand and rebuild (upgrade) the waste water treatment plant.The following main tasks will be included in the scope of the planned investment:1.Cleaning up of the sludge with energy recovery from the biogas:a) sludge technology, including:• Modernisation of raw sewage pumping stations;• Modernisation of primary sedimentation through the introduction of horizontal settlers and the adaptation of the Imhoff septic tan...

18 February 2020

8 February 2020

31 January 2020

14 January 2020