Revision history of "Solution of water and sewage management in Volow Municipality" (Q85388)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 52,899 bytes −11 Changed label, description and/or aliases in sk, lv, da, it, hr, fr, de, fi, et, ro, sv, lt, sl, es, pt, ga, hu, bg, el, cs, nl, mt, and other parts

21 October 2022

26 July 2022

  • curprev 04:0704:07, 26 July 2022DG Regio talk contribs 52,096 bytes +31,257 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 14,191 bytes +1,650 Created claim: summary (P836): Tâches prévues pour la mise en œuvre de la tâche Construction d’un système d’assainissement sanitaire dans la ville de Wołów ul. Forêt et st. T. Kościuszki et ul. Loups de curvy, St. Ludowa, St. Rural et st. C’est Gajowa. Construction d’un système d’assainissement sanitaire à Krzydlina Mała, Krzydlina Wielka, Domaszków. Au total, 29,0 km de réseau d’assainissement sanitaire ont été prévus pour la construction du système de pression gravitationne...
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 12,541 bytes +119 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 12,862 bytes +120 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 12,742 bytes −138 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 12,880 bytes +1,518 Created claim: summary (P836): Tasks to carry out the task Construction of sanitary sewage system in the town of Wołów Street are planned. Forest and St. T. Kosciuszko and St. Crooked Wołów, ul. Ludowa, ul. Rural and St. It’s a grove. Construction of sanitary sewage system in Krzydlina Mała, Krzydlina Wielka, Domaszków. Together, about 29.0 km of sanitary sewage system in the gravity-pressure system, together with drainage pumping stations and at-home sewage pumping stations...
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 11,362 bytes −1,047 Removed claim: summary (P836): It is planned to carry out a task to construct a sewerage system in the town of Wolów ul.And ul.T. Kościuszki and ul.Wolow, ul.People, ul.Rural and ul.Jet.Construction of the sanitary sewage system in Krzydlin Mala, Krzydlin Wielka, Domaszków.Together with the construction of some 29.0 km of the sewerage network in the building, a gravity/discharge system is planned together with the pumping stations for the mains and the home.Output and resul...

23 September 2020

15 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 10,691 bytes +1,047 Created claim: summary (P836): It is planned to carry out a task to construct a sewerage system in the town of Wolów ul.And ul.T. Kościuszki and ul.Wolow, ul.People, ul.Rural and ul.Jet.Construction of the sanitary sewage system in Krzydlin Mala, Krzydlin Wielka, Domaszków.Together with the construction of some 29.0 km of the sewerage network in the building, a gravity/discharge system is planned together with the pumping stations for the mains and the home.Output and result...

18 February 2020

8 February 2020

31 January 2020

14 January 2020