Revision history of "CONSTRUCTION OF WATER AND SEWAGE MANAGEMENT SYSTEM IN JABŁONNA COMMUNE – STAGE AND" (Q85386)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 60,792 bytes −8 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 60,800 bytes +13 Set a claim value: summary (P836): O âmbito material do projeto é a construção de um sistema de esgotos sanitários (incluindo partidas para fronteiras de propriedade privada) com uma extensão de cerca de 53,2 km (incluindo 5,2 prensas de drenagem) nas cidades de Jabłonna (parâmetros líquidos descritos nos capítulos. 6.3 SW), Chotomów e Dąbrowa Chotomowska com a possibilidade de ligar cerca de 5400 habitantes, que representam mais de 30 % da população do município. Para além da constr...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 57,256 bytes +50 Changed label, description and/or aliases in da, it, sk, cs, fi, de, lv, et, el, sv, pt, bg, hu, nl, ga, hr, ro, fr, es, lt, mt, sl, and other parts

21 October 2022

26 July 2022

  • curprev 04:0704:07, 26 July 2022DG Regio talk contribs 56,389 bytes +34,152 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 14,701 bytes +1,798 Created claim: summary (P836): Le champ d’application matériel du projet est la construction d’un système d’assainissement sanitaire (y compris les départs aux limites de la propriété privée) d’une longueur d’env. 53,2 km (y compris environ 5,2 égouts compressés) à Jabłonna (les paramètres du réseau décrits au chapitre 6.3 SW), Chotoms et Dąbrowa Chotomowska avec la possibilité de relier env. 5400 habitants, représentant plus de 30 % de la population de la municipalité. En pl...
  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 12,903 bytes +178 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 13,165 bytes +144 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 13,021 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 13,184 bytes +1,704 Created claim: summary (P836): The material scope of the project is the construction of sanitary sewage system (including departures to private property borders) with a length of approx. 53.2 km (including 5.2 press drainage) in the towns of Jabłonna, (net parameters described in chapters. 6.3 SW), Chotomów and Dąbrowa Chotomowska with the possibility of connecting approx. 5400 inhabitants, which account for more than 30 % of the municipality’s population. In addition to the...
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 11,480 bytes −1,233 Removed claim: summary (P836): The material scope of the project is the construction of a sewerage system (including the opening up to the boundaries of private real estate) of some length.53.2 km (of which 5,2 discharge sewers) in Jabłonna, (the network parameters described in6.3 SW), Chootomes and Chhotomowska, capable of being connected.5400 inhabitants, representing more than 30 % of the municipality’s population.In addition to the construction of the sanitary sewage sy...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 10,997 bytes +1,233 Created claim: summary (P836): The material scope of the project is the construction of a sewerage system (including the opening up to the boundaries of private real estate) of some length.53.2 km (of which 5,2 discharge sewers) in Jabłonna, (the network parameters described in6.3 SW), Chootomes and Chhotomowska, capable of being connected.5400 inhabitants, representing more than 30 % of the municipality’s population.In addition to the construction of the sanitary sewage syst...

18 February 2020

8 February 2020

31 January 2020

14 January 2020