Revision history of "Construction of sewage system in Opole Lubelskie commune – stage II" (Q85385)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 60,606 bytes −16 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 60,622 bytes −17 Set a claim value: summary (P836): Como parte do projeto, será realizada a segunda fase da construção de uma rede de esgotos, onde 774 pessoas serão ligadas à rede de esgotos recém-construída (9,8 km) e: construção de drenos de águas pluviais por comprimento. 376,5 m em ul. Popijarski, aquisição de um camião-cisterna e modernização de uma estação de tratamento de águas residuais com a utilização de FER constituída por: grelha mecânica com recipiente, bombas 5 peças, agitadores para o...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:4318:43, 2 March 2023DG Regio talk contribs 57,109 bytes +720 Changed label, description and/or aliases in it, da, sk, fi, ro, pt, hu, et, fr, el, sl, ga, sv, mt, lt, cs, hr, nl, bg, de, lv, and other parts

21 October 2022

26 July 2022

  • curprev 04:0704:07, 26 July 2022DG Regio talk contribs 55,581 bytes +33,335 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 14,651 bytes +1,824 Created claim: summary (P836): Dans le cadre du projet, la deuxième phase de construction du réseau d’assainissement sera réalisée, qui permettra de raccorder 774 personnes au réseau d’assainissement nouvellement construit (9,8 km), en plus de: exécution de l’assainissement des eaux pluviales 376,5 m en st. Popijarskij, achat d’un pétrolier et modernisation d’une station d’épuration des eaux usées avec l’utilisation de SER consistant à exécuter: grille mécanique avec réservoi...
  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 12,827 bytes +165 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 13,102 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 12,974 bytes −138 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 13,112 bytes +1,638 Created claim: summary (P836): As part of the project, the second stage of the construction of a sewerage network will be carried out, where 774 people will be connected to the newly built sewage system (9.8 km) and: construction of rainwater drains by length. 376.5 m in ul. Popijarski, purchase of a tanker and modernisation of sewage treatment plant with the use of RES consisting of: mechanical grill with container, pumps 5 pieces, agitators for oxygen and anaerobic chamber...
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 11,474 bytes −1,299 Removed claim: summary (P836): The project will implement the second phase of the construction of a sewerage network in which 774 persons will be connected to the newly built sewage system (9.8 km), in addition to the following:performance of the rainwater drainage system with the length of the376.5 m in ul.Popinijarska, purchase of slurry tanker and modernisation of a waste water treatment plant using renewable energy sources, by means of:mechanical cracker with container,...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 11,061 bytes +1,299 Created claim: summary (P836): The project will implement the second phase of the construction of a sewerage network in which 774 persons will be connected to the newly built sewage system (9.8 km), in addition to the following:performance of the rainwater drainage system with the length of the376.5 m in ul.Popinijarska, purchase of slurry tanker and modernisation of a waste water treatment plant using renewable energy sources, by means of:mechanical cracker with container, p...

18 February 2020

8 February 2020

31 January 2020

14 January 2020