Revision history of "Ordering water and sewage management in the Old Babice Municipality – Part III" (Q85353)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 46,715 bytes +8 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 46,707 bytes +8 Set a claim value: summary (P836): O projeto inclui a construção de 20,13 km de sistema de esgotos sanitários, a construção de 7,52 km de rede de abastecimento de água, a modernização do SUW em Old Babice, a extensão do SUW em Borzęcin Small, que consiste num aumento da eficiência em 50 %, a implementação de um sistema de gestão inteligente para as redes de água e esgotos.

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 19:5219:52, 2 March 2023DG Regio talk contribs 43,529 bytes −501 Changed label, description and/or aliases in da, lv, sk, it, lt, ro, fi, pt, ga, et, es, hr, fr, el, nl, hu, sl, cs, bg, de, mt, sv, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0704:07, 26 July 2022DG Regio talk contribs 41,911 bytes +24,454 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 12,155 bytes +1,206 Created claim: summary (P836): Le projet comprend la construction de 20,13 km d’assainissement, la construction de 7,52 km de réseau d’approvisionnement en eau, la modernisation de la SUW dans l’ancienne Babice, l’extension de la SUW à Borzęcin Mały, qui consiste à accroître l’efficacité de 50 %, la mise en place d’un système intelligent de gestion des réseaux d’eau et d’assainissement., translated_summary
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 10,949 bytes +162 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 11,227 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 11,088 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 11,227 bytes +1,153 Created claim: summary (P836): The project includes the construction of 20.13 km of sanitary sewage system, construction of 7.52 km of water supply network, modernisation of SUW in Old Babice, extension of the SUW in Borzęcin Small, consisting of an increase in efficiency by 50 %, implementation of an intelligent management system for water and sewage networks., translated_summary
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 10,074 bytes −706 Removed claim: summary (P836): The project involves the construction of 20.13 km of sanitary sewage system, the construction of 7.52 km of water supply network, modernisation of the SUW in old Babicach, the extension of the SUW in Bortooth, to increase productivity by 50 %, and the implementation of a smart system for management of water and sewerage networks., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1010:10, 4 March 2020DG Regio talk contribs 9,494 bytes +706 Created claim: summary (P836): The project involves the construction of 20.13 km of sanitary sewage system, the construction of 7.52 km of water supply network, modernisation of the SUW in old Babicach, the extension of the SUW in Bortooth, to increase productivity by 50 %, and the implementation of a smart system for management of water and sewerage networks., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020