Revision history of "Comprehensive development of sewage sludge in the Smigiel agglomeration with the construction of a sewage network in Broników, Glińsk and Chełków and the extension of SUW Robaczyn together with the modernisation of the water supply system and the reco" (Q85352)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 59,311 bytes −7 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 59,318 bytes −5 Set a claim value: summary (P836): O âmbito do projeto inclui a construção de um sistema de esgotos sanitários com um comprimento de 9,44 km, a modernização da estação de tratamento de águas residuais em Koszanów, a reconstrução da SUW em Stary Bojanów, a extensão da SUW Robaczyn, a reconstrução da estação de bombagem de água em Karmina. O efeito ecológico do projeto será um aumento no número de usuários que aderiram à rede como resultado do projeto em 690 pessoas, a quantidade de ma...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:1522:15, 2 March 2023DG Regio talk contribs 56,169 bytes +108 Changed label, description and/or aliases in lv, da, it, bg, sk, pt, ro, et, ga, hr, cs, fr, el, lt, nl, hu, es, de, sv, sl, fi, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0704:07, 26 July 2022DG Regio talk contribs 53,946 bytes +32,975 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 13,583 bytes +1,515 Created claim: summary (P836): Le projet comprend la construction d’un système d’assainissement d’une longueur de 9,44 km, la modernisation de la station d’épuration des eaux usées de Koszanów, la reconstruction du SUW à Stary Bojanów, l’extension de la Robaczyn SUW, la reconstruction de la station de pompage de l’eau dans l’alimentation. L’effet écologique du projet sera une augmentation du nombre d’utilisateurs qui ont rejoint le réseau à la suite de la mise en œuvre du pro...
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 12,068 bytes +373 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 12,135 bytes +364 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 11,771 bytes −378 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 12,149 bytes +1,421 Created claim: summary (P836): The scope of the project includes construction of sanitary sewage system with a length of 9.44 km, modernisation of sewage treatment plant in Koszanów, reconstruction of SUW in Stary Bojanów, extension of SUW Robaczyn, reconstruction of water pumping plant in Karmina. The ecological effect of the project will be an increase in the number of users who joined the network as a result of the project by 690 people, the amount of dry mass of municipal...
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 10,728 bytes −1,040 Removed claim: summary (P836): The scope of the project involves the construction of a sanitary sewage system of 9.44 km in length, the modernisation of the wastewater treatment plant in Kozanów, the conversion of the waste water treatment plant in Stary Boyko, the extension of the SUW Robact, the reconstruction of the water pumping station in the carp.The environmental effect of the project will be an increase in the number of users who have joined the network as a result...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1010:10, 4 March 2020DG Regio talk contribs 10,481 bytes +1,040 Created claim: summary (P836): The scope of the project involves the construction of a sanitary sewage system of 9.44 km in length, the modernisation of the wastewater treatment plant in Kozanów, the conversion of the waste water treatment plant in Stary Boyko, the extension of the SUW Robact, the reconstruction of the water pumping station in the carp.The environmental effect of the project will be an increase in the number of users who have joined the network as a result of...

18 February 2020

8 February 2020

31 January 2020

14 January 2020