Revision history of "Reconstruction and expansion of the Municipal Sewage Treatment Plant in Chorzely" (Q85345)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 71,563 bytes +9 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 71,554 bytes +172 Set a claim value: summary (P836): O projecto envolve a reconstrução e ampliação da estação de tratamento de águas residuais existente em Chorzely. Como parte do investimento, serão realizadas as seguintes instalações tecnológicas: ponto de captação de águas residuais, sala com tanque de média, edifício tecnológico, câmara WKF, tanque de lamas, instalação de armazenamento de lamas, biofiltro, tocha de biogás, instalação de dessulfuração de biogás, estação de compressão de gás. O proj...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0604:06, 26 July 2022DG Regio talk contribs 69,363 bytes +44,424 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 15,275 bytes +2,368 Created claim: summary (P836): Le projet porte sur la reconstruction et l’extension de la station d’épuration des eaux usées de Chorzely. Dans le cadre de l’investissement, les installations suivantes seront réalisées: évier d’égouts, réservoir d’assainissement, bâtiment technologique, chambre WKF, réservoir de boues, installation de stockage de boues, biofiltre, torche de biogaz, usine de désulfuration de biogaz, station de compression de gaz. Le projet utilise la stabilisat...
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 12,907 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 13,194 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 13,055 bytes −127 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 13,182 bytes +2,166 Created claim: summary (P836): The project involves the reconstruction and expansion of the existing sewage treatment plant in Chorzely. As part of the investment, the following technological facilities will be carried out: waste water catchment point, room with averaging tank, technological building, WKF chamber, sludge tank, sludge storage facility, biofilter, biogas torch, biogas desulphurisation plant, gas compression station. The project uses the stabilisation of sludge...
  • curprev 15:3615:36, 14 October 2020DG Regio talk contribs 11,016 bytes −1,697 Removed claim: summary (P836): The project involves the reconstruction and extension of the existing sewage treatment plant in Chazele.The investment will include the following technologiczne:punkt water catchment, water catchment, a sieve with an averaging tank, a technology building, a WF compartment, a sediment tank, a sediment storage site, a biofilter, a biogas derivative, a biogas compression station, a gas compression station.The project used the stabilisation of sed...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 11,431 bytes +1,697 Created claim: summary (P836): The project involves the reconstruction and extension of the existing sewage treatment plant in Chazele.The investment will include the following technologiczne:punkt water catchment, water catchment, a sieve with an averaging tank, a technology building, a WF compartment, a sediment tank, a sediment storage site, a biofilter, a biogas derivative, a biogas compression station, a gas compression station.The project used the stabilisation of sedim...

18 February 2020

8 February 2020

31 January 2020

14 January 2020