Revision history of "DEVELOPMENT OF WATER AND SEWAGE MANAGEMENT IN NIEPOŁOMICE COMMUNE" (Q85327)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 57,575 bytes +12 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 57,563 bytes +55 Set a claim value: summary (P836): Âmbito do projecto: — construção da estação de tratamento de águas residuais Q = 16667 RLM em Podłęż (tecnologia MBR), — construção do sistema de esgotos sanitários 14,1 km, — modernização do sistema de esgotos sanitários 2,2 km (custo inelegível), — construção de uma rede de abastecimento de água 8,4 km, — modernização da rede de abastecimento de água 0,7 km, — modernização do reservatório de água limpa em Zagórze — Kacze, reservatório de água limp...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 54,338 bytes −391 Changed label, description and/or aliases in lv, da, sk, el, pt, ro, fi, et, sv, hr, ga, sl, lt, de, hu, bg, nl, es, mt, cs, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0604:06, 26 July 2022DG Regio talk contribs 52,620 bytes +32,125 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 13,390 bytes +1,704 Created claim: summary (P836): Portée du projet: — construction d’une station d’épuration des eaux usées Q = 16667 EH à Podłęz (technologie MBR), — construction d’un réseau d’assainissement de 14,1 km, — modernisation du réseau d’assainissement de 2,2 km (coût non éligible), — construction d’un réseau d’alimentation en eau de 8,4 km, — modernisation du réseau d’approvisionnement en eau 0,7 km, — modernisation du réservoir d’eau propre à Zagórze — Kawcze, un réservoir d’eau pr...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 11,686 bytes +144 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,982 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,857 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,998 bytes +1,537 Created claim: summary (P836): Scope of the project: — construction of sewage treatment plant Q = 16667 RLM in Podłęż (MBR technology), – construction of sanitary sewage system 14.1 km, – modernisation of sanitary sewage system 2.2 km (ineligible cost), – construction of a water supply network 8.4 km, – modernisation of the water supply network 0.7 km, – modernisation of clean water reservoir in Zagórze – Kacze, clean water reservoir in ist. ZUW in Podłęż, intake of undergrou...
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 10,461 bytes −1,176 Removed claim: summary (P836): Scope of the project:— construction of a sewage treatment plant Q = 16667 p.e. in Podtanus (MBR technology), — construction of a sanitary sewage system of 14.1 km — modernisation of the sanitary sewage system of 2.2 km (ineligible cost), — construction of 8.4 km water supply network, — modernisation of the water supply network 0.7 km — modernisation of the drinking water tank in the city of Zóira — Kut, a clean water tank on the site and st.Th...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 10,351 bytes +1,176 Created claim: summary (P836): Scope of the project:— construction of a sewage treatment plant Q = 16667 p.e. in Podtanus (MBR technology), — construction of a sanitary sewage system of 14.1 km — modernisation of the sanitary sewage system of 2.2 km (ineligible cost), — construction of 8.4 km water supply network, — modernisation of the water supply network 0.7 km — modernisation of the drinking water tank in the city of Zóira — Kut, a clean water tank on the site and st.The...

18 February 2020

8 February 2020

31 January 2020

14 January 2020