Revision history of "Development of waste water treatment plants in Kościerzyn in the area of sediment management" (Q85309)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 66,463 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 66,466 bytes −59 Set a claim value: summary (P836): O projeto deve incluir: — modernização da estação de tratamento de águas residuais 3600 m3/dia; 41 717 RLM, incluindo a construção de uma câmara de fermentação fechada com recuperação de biogás; — implementação do sistema SIG de canal de água. O principal objetivo do projeto previsto é modernizar a economia das lamas na estação de tratamento de águas residuais de Kościerzyn. O projeto melhorará o ambiente na aglomeração. As águas residuais de toda a...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 64,856 bytes +859 Changed label, description and/or aliases in da, it, sk, lv, hr, fi, ga, el, es, fr, et, sv, pt, ro, hu, lt, de, nl, sl, bg, cs, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0604:06, 26 July 2022DG Regio talk contribs 61,887 bytes +38,682 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 14,594 bytes +2,128 Created claim: summary (P836): Le projet comprend: — modernisation de la station d’épuration des eaux résiduaires 3 600 m³/jour; 41 717 EH, y compris la construction d’une chambre de fermentation fermée avec récupération du biogaz; — mise en œuvre du système SIG du réseau de canalisation d’eau. L’objectif principal du projet est de moderniser la gestion des boues de la station d’épuration des eaux usées de Kościerzyna. Grâce à la mise en œuvre du projet, l’environnement sera...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 12,466 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 12,753 bytes +152 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 12,601 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 12,745 bytes +1,886 Created claim: summary (P836): The project shall include: — modernisation of the sewage treatment plant 3600 m³/day; 41 717 RLM, including the construction of a closed fermentation chamber with biogas recovery; — implementation of the water-channel GIS system. The main objective of the planned project is to modernise the sludge economy on the sewage treatment plant in Kościerzyn. The project will improve the environment in the Agglomeration. Sewage from the entire Agglomerati...
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 10,859 bytes −1,416 Removed claim: summary (P836): The project includes:Modernisation of the waste water treatment plant 3 600 m³/day;41 717 p.e., including the construction of a closed digester together with the recovery of the biogas;The implementation of the water-to-kan GIS system.The main objective of the planned project is to modernise the sludge management on the sewage treatment plant in Kościerzyna.As a result of the project, there will be an improvement in the environment in the area...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 10,995 bytes +1,416 Created claim: summary (P836): The project includes:Modernisation of the waste water treatment plant 3 600 m³/day;41 717 p.e., including the construction of a closed digester together with the recovery of the biogas;The implementation of the water-to-kan GIS system.The main objective of the planned project is to modernise the sludge management on the sewage treatment plant in Kościerzyna.As a result of the project, there will be an improvement in the environment in the area o...

18 February 2020

8 February 2020

31 January 2020

14 January 2020