Revision history of "Ordering water and sewage management in Bielsk Podlaski" (Q85301)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 55,849 bytes −26 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 55,875 bytes +22 Set a claim value: summary (P836): O projeto deve incluir: — construção de uma rede de esgotos sanitários de 14,28 km com ligação de 1718 RLM; — reconstrução de 10,28 km de rede de abastecimento de água; — construção de uma drenagem de águas pluviais de 9,8 km; — ampliação da estação de tratamento de águas residuais de 45 000 RLM para 60 000 RLM sem alteração da capacidade hidráulica; modernização do tratamento mecânico, biológico e sedimentar. Aquisição de retroescavadora-carregador...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2117:21, 13 August 2022DG Regio talk contribs 52,228 bytes +31,813 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 13,393 bytes +1,721 Created claim: summary (P836): Le projet comprend: — construction de 14,28 km d’assainissement sanitaire avec raccordement de 1718 EH; — reconstruction de 10,28 km du réseau d’approvisionnement en eau; — construction d’un système d’eau de pluie de 9,8 km; — extension de la station de traitement des eaux usées de 45 000 EH à 60 000 EH sans modification de la capacité hydraulique; modernisation de la séquence mécanique, biologique et de traitement des sédiments. Achat d’un char...
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 11,672 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,970 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,856 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,993 bytes +1,556 Created claim: summary (P836): The project shall include: — construction of 14.28 km sanitary sewage system with connection of 1718 RLM; — reconstruction of 10,28 km of water supply network; — construction of rainwater drainage 9,8 km; — extension of the sewage treatment plant from 45 000 RLM to 60 000 RLM without changing hydraulic capacity; modernisation of mechanical, biological and sediment treatment. Purchase of a backhoe-loader, tractor with spreader and tractor with tr...
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 10,437 bytes −1,101 Removed claim: summary (P836): The project includes:Construction of 14.28 km of sewerage including connection with 1718 p.e.;Rebuilding of 10.28 km of water supply network;Construction of the storm water sewage system 9.8 km;An extension of the waste water treatment plant from 45 000 p.e. to 60 000 p.e. without any change in hydraulic capacity;modernisation of mechanical, biological and sludge treatment.The purchase of excavator-loaders, tractor with disconnect and tractor...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 10,256 bytes +1,101 Created claim: summary (P836): The project includes:Construction of 14.28 km of sewerage including connection with 1718 p.e.;Rebuilding of 10.28 km of water supply network;Construction of the storm water sewage system 9.8 km;An extension of the waste water treatment plant from 45 000 p.e. to 60 000 p.e. without any change in hydraulic capacity;modernisation of mechanical, biological and sludge treatment.The purchase of excavator-loaders, tractor with disconnect and tractor wi...

18 February 2020

8 February 2020

31 January 2020

14 January 2020