Revision history of "Improving the protection of the environment and the quality of life of residents by regulating water and sewage management in the agglomeration of Izabelin – Part II" (Q85296)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 49,026 bytes 0 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 49,026 bytes +4 Set a claim value: summary (P836): O projeto inclui a construção de um sistema de esgoto sanitário com um comprimento de 5,62 km, a construção de uma rede de abastecimento de água com um comprimento de 4,10 km. Além disso, o projeto modernizará o nó de pré-tratamento das estações de tratamento de águas residuais e implementará um sistema de classe SIG para a gestão inteligente dos ativos da rede.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0604:06, 26 July 2022DG Regio talk contribs 43,810 bytes +25,703 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 12,448 bytes +1,198 Created claim: summary (P836): Le projet comprend la construction d’un système de plomberie d’une longueur de 5,62 km, la construction d’un réseau d’alimentation en eau d’une longueur de 4,10 km. En outre, le projet modernisera le nœud de prétraitement de la station de traitement des eaux usées et mettra en place un système de classe SIG pour la gestion intelligente des actifs du réseau., translated_summary
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 11,250 bytes +265 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,425 bytes +227 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,198 bytes −231 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,429 bytes +1,149 Created claim: summary (P836): The project includes the construction of sanitary sewage system with a length of 5.62 km, the construction of a water supply network with a length of 4.10 km. In addition, the project will modernise the pre-treatment node for waste water treatment plants and implement a GIS class system for intelligent network asset management., translated_summary
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 10,280 bytes −732 Removed claim: summary (P836): The project involves the construction of a sanitary sewage system of 5.62 km in length, construction of a water supply network of 4.10 km in length.In addition, the project will upgrade the pre-treatment node of the pre-treatment plant to the wastewater treatment plant and will implement a system of GIS class for the smart management of the network assets., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 9,724 bytes +732 Created claim: summary (P836): The project involves the construction of a sanitary sewage system of 5.62 km in length, construction of a water supply network of 4.10 km in length.In addition, the project will upgrade the pre-treatment node of the pre-treatment plant to the wastewater treatment plant and will implement a system of GIS class for the smart management of the network assets., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020