Revision history of "A comprehensive solution for waste water management in the area of the Parczew agglomeration" (Q85295)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 45,436 bytes +13 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 45,423 bytes +19 Set a claim value: summary (P836): Modernização das estações de tratamento de águas residuais para cumprir os requisitos da diretiva (azoto e fósforo) e aumento do rendimento, na aceção de carga aceitável pela estação de tratamento, de 15 000 RLM para 15 700 RLM. Construção de um sistema de esgotos sanitários: São 0,221 milhas.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 42,229 bytes −734 Changed label, description and/or aliases in da, it, sk, lv, fi, sv, sl, de, ro, cs, lt, pt, es, hr, nl, bg, fr, ga, et, hu, mt, el, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0604:06, 26 July 2022DG Regio talk contribs 40,854 bytes +23,792 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 11,974 bytes +1,137 Created claim: summary (P836): Modernisation des stations d’épuration des eaux usées afin de satisfaire aux exigences de la directive (azote et phosphore) et augmentation de la capacité en termes de charge de pollution acceptable pour l’installation d’épuration de 15 000 EH à 15 700 EH. Construction d’égouts sanitaires: 0,221 km., translated_summary
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 10,837 bytes +139 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,138 bytes +151 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 10,987 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,126 bytes +1,105 Created claim: summary (P836): Modernisation of waste water treatment plants to meet the requirements of the Directive (nitrogen and phosphorus) and increase throughput in the sense of charge acceptable by the treatment plant from 15 000 RLM to 15 700 RLM. Construction of sanitary sewage system: It’s 0,221 miles., translated_summary
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 10,021 bytes −684 Removed claim: summary (P836): The modernisation of the wastewater treatment plant in terms of meeting the requirements of the Directive (nitrogen and phosphorus) and the increase in capacity in the sense of the pollutant load acceptable to the treatment plant with 15 000 p.e. of 15 700 p.e.Construction of sanitary sewage system:0.221 km., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 9,417 bytes +684 Created claim: summary (P836): The modernisation of the wastewater treatment plant in terms of meeting the requirements of the Directive (nitrogen and phosphorus) and the increase in capacity in the sense of the pollutant load acceptable to the treatment plant with 15 000 p.e. of 15 700 p.e.Construction of sanitary sewage system:0.221 km., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020