Revision history of "Reconstruction and modernisation of waste water treatment plant with central pumping plant and efficient management of water and sewage system in Biała Podlaska" (Q85294)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 49,550 bytes −7 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 49,557 bytes −47 Set a claim value: summary (P836): O projeto inclui a modernização e ampliação da estação de tratamento de águas residuais para a possibilidade de tratamento de águas residuais em caso de aumento do afluxo de águas residuais. Além disso, o projeto modernizará a estação central de bombagem de águas residuais, instalará um sistema SIG e adquirirá equipamento especializado de deteção de fugas na rede.

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

3 March 2023

  • curprev 00:3600:36, 3 March 2023DG Regio talk contribs 47,934 bytes +1,012 Changed label, description and/or aliases in da, it, sk, ga, et, fi, de, bg, hr, lv, es, pt, cs, fr, nl, hu, ro, lt, sl, el, mt, sv, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2117:21, 13 August 2022DG Regio talk contribs 44,808 bytes +26,478 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 12,532 bytes +1,244 Created claim: summary (P836): Le projet comprend la modernisation et l’agrandissement de la station d’épuration des eaux usées en ce qui concerne la possibilité d’un traitement des eaux résiduaires en cas d’afflux accru d’eaux usées. En outre, le projet permettra de moderniser la station centrale de pompage des eaux usées, d’installer le système SIG et d’acheter des équipements spécialisés pour détecter les fuites du réseau., translated_summary
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 11,288 bytes +281 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,447 bytes +221 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,226 bytes −253 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 11,479 bytes +1,142 Created claim: summary (P836): The project includes the modernisation and extension of the sewage treatment plant for the possibility of waste water treatment in case of increased inflow of waste water. In addition, the project will modernise the central sewage pumping station, install a GIS system and buy specialised network leak detection equipment., translated_summary
  • curprev 15:3515:35, 14 October 2020DG Regio talk contribs 10,337 bytes −708 Removed claim: summary (P836): The project consists of the modernisation and extension of the waste water treatment plant for waste water treatment in the event of an increased inflow of waste water.In addition, the project will modernise the central sewage pumping station, a system of GIS and the purchase of specific equipment for the detection of network leakage., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 9,761 bytes +708 Created claim: summary (P836): The project consists of the modernisation and extension of the waste water treatment plant for waste water treatment in the event of an increased inflow of waste water.In addition, the project will modernise the central sewage pumping station, a system of GIS and the purchase of specific equipment for the detection of network leakage., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020