Revision history of "Modernisation and development of water and sewage management in the Radom agglomeration – stage III" (Q85286)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 56,805 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 56,808 bytes +19 Set a claim value: summary (P836): O projeto abrange: • construção de um sistema de esgotos sanitários com um comprimento de 32,1 km • modernização de um sistema de esgotos sanitários com um comprimento de 68,5 km • construção de um sistema de esgotos de águas pluviais com um comprimento de 13,1 km • modernização de uma estação de tratamento de esgotos na gama de sedimentos • construção de uma rede de água com um comprimento de 32,9 km • modernização do sistema de abastecimento de ág...

20 March 2024

15 January 2024

13 December 2023

28 June 2023

14 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2117:21, 13 August 2022DG Regio talk contribs 51,059 bytes +30,556 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 13,020 bytes +1,433 Created claim: summary (P836): Le champ d’application du projet comprend: • construction d’un système d’assainissement sanitaire d’une longueur de 32,1 km • modernisation du système d’assainissement d’une longueur de 68,5 km • construction d’un réseau d’eau de pluie de 13,1 km de long • modernisation de la station d’épuration des eaux usées dans la zone des boues • construction d’un réseau d’alimentation en eau d’une longueur de 32,9 km • modernisation du réseau d’eau de 26,7...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 11,587 bytes +177 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 11,850 bytes +161 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 11,689 bytes −169 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 11,858 bytes +1,466 Created claim: summary (P836): The project covers: • construction of sanitary sewage system with a length of 32.1 km • modernisation of sanitary sewage system with a length of 68.5 km • construction of rainwater sewage system with a length of 13.1 km • modernisation of sewage treatment plant in the sediment range • construction of a water network with a length of 32.9 km • modernisation of the water supply system with a length of 26.7 km • intelligent network management syste...
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 10,392 bytes −986 Removed claim: summary (P836): The scope of the project shall be to:• the construction of a sewerage system of 32.1 km long• construction of a sewerage system of 68.5 km long• construction of a sewerage system of 13.1 km long• construction of a sewage water treatment plant of 32.9 km• construction of a 26.7 km water network• intelligent network management systems (SCADA)• modernisation of the water supply system (SCADA system)• modernisation of the water supply system (SCAD...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 10,090 bytes +986 Created claim: summary (P836): The scope of the project shall be to:• the construction of a sewerage system of 32.1 km long• construction of a sewerage system of 68.5 km long• construction of a sewerage system of 13.1 km long• construction of a sewage water treatment plant of 32.9 km• construction of a 26.7 km water network• intelligent network management systems (SCADA)• modernisation of the water supply system (SCADA system)• modernisation of the water supply system (SCADA)...

18 February 2020

8 February 2020

31 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)