Revision history of "Construction of sewage systems and modernisation of sewage treatment plants in the Aleksandrów Kujawski agglomeration – stage II" (Q85270)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2206:22, 13 October 2024DG Regio talk contribs 58,280 bytes −10 Changed label, description and/or aliases in pt
  • curprev 06:2206:22, 13 October 2024DG Regio talk contribs 58,290 bytes −8 Set a claim value: summary (P836): O projeto é realizado dentro dos limites da aglomeração de Aleksandrów Kujawski com uma dimensão de 20 248 RLM. A aglomeração é explorada por uma estação de tratamento de águas residuais localizada em Aleksandrów Kujawski, com uma capacidade de 33 712 RLM. Âmbito do projecto: • Construção de uma rede de esgotos L= 5,17 km • Reconstrução (capítulo) da drenagem geral L= 6,35 km • Construção da rede de chuvas L= 3,98 km • Implementação de um sistema in...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 55,128 bytes −324 Changed label, description and/or aliases in lv, da, it, bg, sk, et, hr, lt, es, pt, ro, ga, hu, fr, sv, de, sl, el, mt, cs, fi, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2017:20, 13 August 2022DG Regio talk contribs 53,324 bytes +32,602 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 13,579 bytes +1,674 Created claim: summary (P836): Projet mis en œuvre dans les limites de l’agglomération d’Aleksandrów Kujawski avec une taille de 20 248 EH. L’agglomération est desservie par une station d’épuration des eaux usées située à Aleksandrów Kujawski d’une capacité de 33 712 EH. Portée du projet: • Construction d’un réseau d’assainissement L=5,17 km • Reconstruction (chapitre) du système d’assainissement combiné L=6,35 km • Construction d’un réseau d’eaux pluviales L= 3,98 km • Mise...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 11,905 bytes +228 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 12,117 bytes +191 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 11,926 bytes −192 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 12,118 bytes +1,531 Created claim: summary (P836): The project is carried out within the boundaries of the Aleksandrów Kujawski agglomeration with a size of 20 248 RLM. The agglomeration is operated by a sewage treatment plant located in Aleksandrów Kujawski with a capacity of 33 712 RLM. Scope of the project: • Construction of a sewage network L= 5.17 km • Reconstruction (chapter) of general drainage L= 6.35 km • Construction of the rain network L= 3.98 km • Implementation of intelligent water...
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 10,587 bytes −1,133 Removed claim: summary (P836): Project implemented within the boundaries of the Aleksandrów Kujawski agglomeration with a population of 20 248 p.e.The agglomeration operates a wastewater treatment plant located in Aleksandrów Kujawski with a capacity of 33 712 p.e.Scope of the project:• Construction of the sewage system L = 5.17 km• Construction (chapter) of the combined sewerage system L = 6.35 km• Construction of the storm water network L = 3.98 km• Implementation of a sm...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 10,444 bytes +1,133 Created claim: summary (P836): Project implemented within the boundaries of the Aleksandrów Kujawski agglomeration with a population of 20 248 p.e.The agglomeration operates a wastewater treatment plant located in Aleksandrów Kujawski with a capacity of 33 712 p.e.Scope of the project:• Construction of the sewage system L = 5.17 km• Construction (chapter) of the combined sewerage system L = 6.35 km• Construction of the storm water network L = 3.98 km• Implementation of a smar...

18 February 2020

8 February 2020

31 January 2020

14 January 2020