Revision history of "Creation of an innovative system of sediment management and water treatment for the needs of the Minsk Mazowiecki agglomeration" (Q85268)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 66,389 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 66,392 bytes +35 Set a claim value: summary (P836): O projeto é realizado dentro dos limites da aglomeração de Mińsk Mazowiecki com a dimensão de 57 722 RLM. Âmbito do projecto: • Modernização da estação de tratamento de Minsk Mazowiecki com capacidade Q=82 200 RLM, os robôs incluem um nó de economia mecânica, biológica e sedimentar – aumentando a capacidade da instalação de lamas e a eficiência do seu funcionamento resultante da necessidade de adaptar as instalações/instalação à quantidade de lamas...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0504:05, 26 July 2022DG Regio talk contribs 61,646 bytes +38,703 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 14,522 bytes +2,001 Created claim: summary (P836): Projet mis en œuvre dans les limites de l’agglomération de Minsk Mazowiecki d’une taille de 57 722 EH. Portée du projet: • Modernisation de l’usine de Minsk Mazowiecki d’une capacité de Q=82 200 EH, les travaux comprennent une partie mécanique, biologique et un nœud de gestion des sédiments — une augmentation de la capacité du système sédimentaire et son efficacité en raison de la nécessité d’adapter les installations/installations à la quantité...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 12,521 bytes +192 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 12,769 bytes +187 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 12,582 bytes −174 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 12,756 bytes +1,888 Created claim: summary (P836): The project is carried out within the limits of the Mińsk Mazowiecki agglomeration with the size of 57 722 RLM. Scope of the project: • Modernisation of the treatment plant in Minsk Mazowiecki with capacity Q=82 200 RLM, robots include mechanical, biological and sediment economy node – increasing the capacity of the sludge installation and the efficiency of its operation resulting from the need to adapt the facilities/installation to the amount...
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 10,868 bytes −1,460 Removed claim: summary (P836): Project implemented within the boundaries of the agglomeration of Mińsk Mazowiecki with a size of 57 722 p.e.Scope of the project:• The modernisation of the wastewater treatment plant in Minsk Mazowiecki with a capacity of Q = 82 200 p.e., works include the mechanical, biological part and the sludge management node — increase the capacity of the sludge facility and the efficiency of its work as a result of the need to adapt the facilities/inst...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 11,046 bytes +1,460 Created claim: summary (P836): Project implemented within the boundaries of the agglomeration of Mińsk Mazowiecki with a size of 57 722 p.e.Scope of the project:• The modernisation of the wastewater treatment plant in Minsk Mazowiecki with a capacity of Q = 82 200 p.e., works include the mechanical, biological part and the sludge management node — increase the capacity of the sludge facility and the efficiency of its work as a result of the need to adapt the facilities/instal...

18 February 2020

8 February 2020

31 January 2020

14 January 2020