Revision history of "Extension and modernisation of the sewage treatment plant in Wągrowiec" (Q85266)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 59,932 bytes +905 Changed label, description and/or aliases in ga, lv, it, da, fi, sk, et, bg, hr, es, ro, pt, sv, el, lt, de, cs, fr, hu, nl, sl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0504:05, 26 July 2022DG Regio talk contribs 56,914 bytes +35,234 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 13,963 bytes +1,855 Created claim: summary (P836): Projet mis en œuvre dans les limites de l’agglomération de Wągrowiec d’une taille de 33 300 EH. Portée du projet: Modernisation de l’usine de traitement des eaux usées de Wągrowiec couvrant les parties mécaniques, biologiques et des boues ainsi que de la station de pompage principale à ul. Couvent et canalisations sous pression L=2x1,8 km. Mise en place d’un système de gestion intelligent des réseaux d’eau et d’assainissement — SIG. La modernisa...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 12,108 bytes +144 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 12,404 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 12,274 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 12,407 bytes +1,759 Created claim: summary (P836): The project is carried out within the boundaries of the agglomeration Wągrowiec with a size of 33 300 RLM. Scope of the project: Modernisation of the sewage treatment plant in Wągrowiec including mechanical, biological and sediment parts together with the main pumping plant at ul. Monastic and pressing pipelines L=2x1,8 km. Implementation of an intelligent management system for water and sewage networks – GIS. Modernisation of the treatment plan...
  • curprev 15:3415:34, 14 October 2020DG Regio talk contribs 10,648 bytes −1,281 Removed claim: summary (P836): Project carried out within the limit of 33 300 p.e.Scope of the project:Modernisation of the wastewater treatment plant in Wągocu, which includes the mechanical, biological and sediment components, together with the sewage treatment plant with the main pumping station at ul.2 x 1.8 km.Implementation of a smart system for the management of water and wastewater networks — GIS.The modernisation of the plant is intended to optimise the capacity of...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 10,643 bytes +1,281 Created claim: summary (P836): Project carried out within the limit of 33 300 p.e.Scope of the project:Modernisation of the wastewater treatment plant in Wągocu, which includes the mechanical, biological and sediment components, together with the sewage treatment plant with the main pumping station at ul.2 x 1.8 km.Implementation of a smart system for the management of water and wastewater networks — GIS.The modernisation of the plant is intended to optimise the capacity of t...

18 February 2020

8 February 2020

31 January 2020

14 January 2020