Revision history of "Ordering water and sewage management in Raszyn Municipality – Phase V" (Q85258)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 40,754 bytes +382 Changed label, description and/or aliases in it, lv, da, sk, ga, fi, et, es, hr, sl, ro, cs, sv, de, el, fr, lt, nl, bg, pt, hu, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2017:20, 13 August 2022DG Regio talk contribs 38,253 bytes +21,848 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

29 October 2020

14 October 2020

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 9,211 bytes +577 Created claim: summary (P836): The project involves the construction of a sewerage network with a total length of 41.25 km and the purchase and installation of the GIS system.3 622 p.e. will be connected to the sewerage network built., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020