Revision history of "Extension of the water supply and sewage network in Stary Sącz commune" (Q85248)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 45,346 bytes +11 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 45,335 bytes +8 Set a claim value: summary (P836): O âmbito material do projeto inclui a construção de um sistema de esgotos sanitários de 15,18 km com ligação de 2 228 RLM, a construção de uma central fotovoltaica microelétrica numa estação de bombagem de esgotos e a extensão do sistema SIG para a gestão da água e das águas residuais.

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 42,157 bytes −193 Changed label, description and/or aliases in da, it, sk, fi, cs, lv, sv, ga, el, ro, bg, pt, sl, mt, et, fr, lt, hu, nl, es, hr, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0504:05, 26 July 2022DG Regio talk contribs 40,237 bytes +23,241 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,946 bytes +1,173 Created claim: summary (P836): Le champ d’application matériel du projet comprend la construction de 15,18 km de réseau d’assainissement sanitaire avec raccordement de 2 228 EH, la construction d’une centrale photovoltaïque microélectrique à la station de pompage des eaux usées et l’extension du système SIG pour la gestion des réseaux d’eau et d’assainissement, translated_summary
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 10,773 bytes +166 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 11,047 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 10,917 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 11,057 bytes +1,086 Created claim: summary (P836): The project’s material scope includes the construction of 15.18 km sanitary sewage system with connection of 2 228 RLM, construction of 1 photovoltaic microelectric power plant on sewage pumping plant and extension of the GIS system for water and sewage management, translated_summary
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 9,971 bytes −653 Removed claim: summary (P836): The project’s material scope includes the construction of 15.18 km of sewerage connection to the connection of 2 228 p.e., the construction of 1 micro-PV plants for sewage pumping stations and the development of the GIS system for the management of water and sewerage networks., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 9,342 bytes +653 Created claim: summary (P836): The project’s material scope includes the construction of 15.18 km of sewerage connection to the connection of 2 228 p.e., the construction of 1 micro-PV plants for sewage pumping stations and the development of the GIS system for the management of water and sewerage networks., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020