Revision history of "“Water supply and waste water treatment in Warsaw – Phase VI”" (Q85242)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 57,490 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 57,490 bytes +79 Set a claim value: summary (P836): O projeto deve incluir: — construção de 30,48 km de rede de esgotos sanitários; — ligação de 5700 RLM à rede de esgotos; — construção de 23,19 km de rede de abastecimento de água; — ligação de 6720 pessoas à rede de abastecimento de água; — modernização da estação de tratamento de águas residuais (SUW). É metade. Wieliszew) 1 PCes; — modernização da estação de tratamento de águas residuais 2 unidades. (produtos de limpeza de Czajka e Sul), nomeadame...

22 March 2024

15 January 2024

13 December 2023

28 June 2023

14 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0504:05, 26 July 2022DG Regio talk contribs 52,790 bytes +31,742 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 13,357 bytes +1,668 Created claim: summary (P836): Le projet comprend: — construction de 30,48 km d’assainissement sanitaire; — raccordement de 5700 EH au réseau d’assainissement; — construction de 23,19 km de réseau d’approvisionnement en eau; — raccordement de 6720 personnes à l’approvisionnement en eau; — modernisation de la SUW (usine d’eau. La moitié. Wieliszew) 1 pièce; — modernisation de l’usine de traitement des eaux usées 2 pcs. (nettoyage «Czajka» et «Sud»), y compris dans le secteur d...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,689 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 11,987 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 11,861 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 11,987 bytes +1,562 Created claim: summary (P836): The project shall include: — construction of 30.48 km of sanitary sewage system; — connection of 5700 RLM to the sewer system; — construction of 23,19 km of water supply network; — connection of 6720 persons to the water supply; — modernisation of the SUW (Water Plant). It’s a half. Wieliszew) 1 pcs; — modernisation of waste water treatment plant 2 pcs. (Czajka and South cleaners), among others in the area of sediment house (South) and the const...
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 10,425 bytes −1,009 Removed claim: summary (P836): The project includes:Construction of 30.48 km of sanitary sewerage;A connection of 5700 p.e. to the sewerage system;Construction of 23.19 km of water supply network;— connect 6720 persons to the mains;Modernisation of SUW (Zakład wd.Mr PÓŁN.Wieliczka, 1;Modernisation of the wastewater treatment plant 2;(“Czajka” and “South”), including between sediment (south) and the construction of a biogas station (with the Czajka WWTP);Upgrading the sewage...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 10,144 bytes +1,009 Created claim: summary (P836): The project includes:Construction of 30.48 km of sanitary sewerage;A connection of 5700 p.e. to the sewerage system;Construction of 23.19 km of water supply network;— connect 6720 persons to the mains;Modernisation of SUW (Zakład wd.Mr PÓŁN.Wieliczka, 1;Modernisation of the wastewater treatment plant 2;(“Czajka” and “South”), including between sediment (south) and the construction of a biogas station (with the Czajka WWTP);Upgrading the sewage s...

18 February 2020

8 February 2020

31 January 2020

14 January 2020