Revision history of "“Organisation of water and sewage management in the Wałbrzych Water and Sewerage Union – Stage II”" (Q85229)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2206:22, 13 October 2024DG Regio talk contribs 71,483 bytes +21 Changed label, description and/or aliases in pt
  • curprev 06:2206:22, 13 October 2024DG Regio talk contribs 71,462 bytes −130 Set a claim value: summary (P836): O projeto é realizado na aglomeração de Wałbrzych, na aglomeração de Walim e na aglomeração de Boguszów-Gorce. O âmbito de aplicação material deve incluir: —construção da rede de esgotos -15,15 km (incluindo 1,696 km em termos de custos da NKW) -construção da rede de esgotos – 2,11 km, -construção da rede de abastecimento de água – 1,47 km (custo da NKW), -reconstrução da rede de abastecimento de água – 5,06 km, -compra de veículos especializados co...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:3121:31, 2 March 2023DG Regio talk contribs 68,422 bytes +2,501 Changed label, description and/or aliases in it, da, sk, fr, lv, fi, hr, sv, el, ga, lt, ro, bg, de, et, cs, hu, pt, sl, nl, mt, es, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0404:04, 26 July 2022DG Regio talk contribs 62,598 bytes +38,619 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 14,864 bytes +2,223 Created claim: summary (P836): Le projet est mis en œuvre dans l’agglomération de Wałbrzych, l’agglomération Walim et l’agglomération Boguszów-Gorce. Le champ d’application matériel comprend: —construction d’un réseau d’assainissement — 15,15 km, (dont 1,696 km en termes de coûts NKW) — reconstruction du réseau d’assainissement — 2,11 km, -construction d’un réseau d’approvisionnement en eau — 1,47 km, -reconstruction du réseau d’alimentation en eau — 5,06 km, — achat de véhic...
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 12,641 bytes +216 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 12,865 bytes +165 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 12,700 bytes −161 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 12,861 bytes +1,854 Created claim: summary (P836): The project is carried out in the Wałbrzych Agglomeration, the Walim Agglomeration and the Boguszów-Gorce Agglomeration. The material scope shall include: —construction of sewage network -15.15 km (including 1.696 km in terms of costs of NKW) -construction of sewage network – 2.11 km, -construction of water network – 1.47 km, (cost of NKW), -reconstruction of water network – 5.06 km, -purchase of specialised vehicles designed for monitoring and...
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,007 bytes −1,554 Removed claim: summary (P836): The project is being implemented in the agglomeration of Wałbrzych, the agglomeration of Valaliam and the Aglomeracja Boguszów Gorce.The material scope consists of:— construction of a sewage network — 15.15 km (including 1.696 km for the cost of the NEC) — to build up the sewage network — 2.11 km, to build a water supply network — 1.47 km, (cost of the NKW), -conversion of the water supply network — 5.06 km, -purchase of specialised vehicles f...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 11,285 bytes +1,554 Created claim: summary (P836): The project is being implemented in the agglomeration of Wałbrzych, the agglomeration of Valaliam and the Aglomeracja Boguszów Gorce.The material scope consists of:— construction of a sewage network — 15.15 km (including 1.696 km for the cost of the NEC) — to build up the sewage network — 2.11 km, to build a water supply network — 1.47 km, (cost of the NKW), -conversion of the water supply network — 5.06 km, -purchase of specialised vehicles for...

18 February 2020

8 February 2020

31 January 2020

14 January 2020