Revision history of "Extension of the sewage and sediment management system in the Kołobrzeg agglomeration" (Q85214)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 83,580 bytes +11 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 83,569 bytes +99 Set a claim value: summary (P836): As tarefas que constituem o âmbito do projeto são as seguintes: — tratamento de lamas de depuração na estação de tratamento de águas residuais de Korzyścienek; — SIG fixo e móvel sem iniciadores cartográficos; — construção de um sistema de esgotos sanitários em ul. Gniezno em Kołobrzeg – 0,77 km; — construção de um sistema de esgotos sanitários e de uma rede de abastecimento de água em ul. Acácia em Ustroń Maritime – 0,6 km de esgotos sanitários e 0...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 80,300 bytes −414 Changed label, description and/or aliases in da, it, lv, sk, bg, el, fr, ro, et, sl, ga, pt, fi, sv, cs, es, de, hu, hr, lt, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2017:20, 13 August 2022DG Regio talk contribs 78,595 bytes +50,603 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 16,658 bytes +2,932 Created claim: summary (P836): Les tâches entrant dans le champ d’application du projet sont les suivantes: — la gestion des boues d’épuration à la station d’épuration des eaux usées de Korzyścienek; — système de SIG fixe et mobile sans traverses cartographiques; — construction d’un réseau d’assainissement sanitaire à ul. Gniezno à Kołobrzeg — 0,77 km; — construction d’un réseau d’assainissement sanitaire et d’un réseau d’approvisionnement en eau à ul. Akaciaowa à Ustroń Mari...
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 13,726 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 13,995 bytes +145 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 13,850 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 13,989 bytes +2,543 Created claim: summary (P836): The tasks constituting the scope of the project shall be: — treatment of sewage sludge in the sewage treatment plant in Korzyścienek; — stationary and mobile GIS without mapping primers; — construction of sanitary sewage system in ul. Gniezno in Kołobrzeg – 0,77 km; — construction of sanitary sewage system and water supply network in ul. Acacia in Ustroń Maritime – 0.6 km of sanitary sewage and 0.36 km of water supply; — construction of sanitary...
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,446 bytes −2,052 Removed claim: summary (P836): The tasks which fall within the scope of the project are as follows:The disposal of sewage sludge at the wastewater treatment plant in the waste water plant;— stationary and mobile GIS system without mats;Construction of a sewerage network in ul.Gniezno in Kołobrzeg, 0.77 km;Construction of a sewage system and a water supply network at ul.Acacia in the sea accommodation — 0.6 km of sanitary sewage system and 0.36 km of water supply;Constructio...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 12,216 bytes +2,052 Created claim: summary (P836): The tasks which fall within the scope of the project are as follows:The disposal of sewage sludge at the wastewater treatment plant in the waste water plant;— stationary and mobile GIS system without mats;Construction of a sewerage network in ul.Gniezno in Kołobrzeg, 0.77 km;Construction of a sewage system and a water supply network at ul.Acacia in the sea accommodation — 0.6 km of sanitary sewage system and 0.36 km of water supply;Construction...

18 February 2020

8 February 2020

31 January 2020

14 January 2020