Revision history of "Construction of sanitary sewage system and modernisation of waste water treatment plant in Brzeszcze Municipality" (Q85211)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 45,356 bytes +24 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 45,332 bytes +23 Set a claim value: summary (P836): Âmbito do projecto: — Reconstrução de estações de tratamento de águas residuais em Brzeszcze (partes mecânicas, biológicas e sedimentares), com uma redução da capacidade de 27 000 para 26 000 RLM; — Construção de um sistema de esgotos sanitários de 14,78 km (ligação de 1452 RLM); — Construção de drenagem de águas pluviais 1,95 km.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 43,640 bytes −545 Changed label, description and/or aliases in da, lv, it, sl, sk, fi, et, de, ro, hu, lt, pt, nl, fr, sv, el, ga, cs, hr, bg, mt, es, and other parts

27 October 2022

26 October 2022

21 October 2022

27 September 2022

26 July 2022

  • curprev 04:0404:04, 26 July 2022DG Regio talk contribs 42,065 bytes +24,679 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 12,122 bytes +1,167 Created claim: summary (P836): Portée du projet: — Reconstruction de la station d’épuration des eaux résiduaires de Brzecze (parties mécaniques, biologiques et boues), avec une réduction de la capacité de 27 000 à 26 000 EH; — Construction d’un réseau d’assainissement de 14,78 km (connexion 1452 EH); — Construction d’égouts d’eau de pluie 1,95 km., translated_summary
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 10,955 bytes +216 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,179 bytes +173 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,006 bytes −177 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,183 bytes +1,129 Created claim: summary (P836): Scope of the project: — Reconstruction of waste water treatment plants in Brzeszcze (mechanical, biological and sediment parts), with a capacity reduction from 27 000 to 26 000 RLM; — Construction of sanitary sewage system 14,78 km (connection of 1452 RLM); — Construction of rainwater drainage 1.95 km., translated_summary
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 10,054 bytes −689 Removed claim: summary (P836): Scope of the project:— Construction of a sewage treatment plant in Breszczach (mechanical, biological and sediment parts) with a capacity reduction of 27 000 to 26 000 p.e.;— Construction of a sanitary sewerage system of 14.78 km (connection 1452 p.e.);Construction of the storm water sewerage system 1.95 km., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 9,457 bytes +689 Created claim: summary (P836): Scope of the project:— Construction of a sewage treatment plant in Breszczach (mechanical, biological and sediment parts) with a capacity reduction of 27 000 to 26 000 p.e.;— Construction of a sanitary sewerage system of 14.78 km (connection 1452 p.e.);Construction of the storm water sewerage system 1.95 km., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020